Feedback
HOME
IKE
CATER
PROCEDURES
KLYSTRONS
THYRATRONS
NIRP
LLRF
SLED
Thyratron Data
Removal Form
Installation Form
Charts
Station
XTCAV
S/N
300483
Currently Installed Thyratron at XTCAV
Edit
Station
S/N
Model
Installed Date
In HVRTM
In Res V
Install Notes
Current Hv Hrs
Thy Rem
XTCAV
300483
L4888
07-NOV-2025
28345
3.3
N
1 - 1
Install History for Thyratron 300483
Edit
Station
S/N
Model
Installed Date
Removal Date
In HVRTM
Rem HVRTM
Total HVRTM
Install Notes
Removal Reason
Removal Notes
In Res V
Rem Res V
CATER
XTCAV
300483
L4888
07-NOV-2025
28345
3.3
1 - 1
Previous Thyratrons installed at XTCAV
Edit
Station
S/N
Model
Installed Date
Removal Date
In HVRTM
Rem HVRTM
Total HVRTM
Install Notes
Removal Reason
Removal Notes
In Res V
Rem Res V
CATER
XTCAV
300152
L4888S
30-JUN-2021
07-NOV-2025
11321
28345
17024
Unstable performance
3.65
4.9
180884
XTCAV
101187
L4888
04-AUG-2015
30-JUN-2021
12021
11321
Other (see notes)
Upgrade to deuterium thyratron.
3
4.73
151409
XTCAV
943
F241
12-JAN-2002
04-AUG-2015
87157
112021
24864
Modulator 8-7 moved to B921 with this thyratron 10-01-2012. CATER: 103977
Other (see notes)
Not firing.
4.5
7.7
126616
1 - 3