LCLS SC Downtime JOBS    16-DEC-2025 06:00   to   21-DEC-2026 16:00

1 - 1

Total JobsActiveCompleteDroppedRolledDeniedRSWCFsAddedLast Update
2501627882202210207-FEB-2026 16:47:41230




INJECTOR WEST
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
18043815PEMActiveYesNoDC MAGNETS05-JAN-2026 00:0030-JUN-2026 00:00Lam, Briant K.disconnect cables for bucking coil, solenoids all 5 correctors and reconnect later after the work is doneZhou, Feng
18043811CTLActiveYesNoOTHER05-JAN-2026 00:00 - Bong, Jamesremove tuners and reinstall them later Zhou, Feng
18043812AEGActiveYesNoOTHER05-JAN-2026 00:00 - Gassner, Georg L.metrology correctors & SOL1/2 before the work starts and after the work is complete metrology M1 again after Zhou, Feng
18043813CTLActiveYesNoOTHER05-JAN-2026 00:00 - Alverson, Shawn Christopherreconnect laser control cables Zhou, Feng
18043819CTLActiveYesNoOTHER06-JAN-2026 00:0009-JAN-2026 00:00Hoobler, SonyaReconnect cables for BPM1B and BPM2BZhou, Feng
1804381OTHERActiveYesNoOTHER16-DEC-2025 00:00 - Zhou, FengGun+LEB repairZhou, Feng
18043821MFDMActiveYesNoOTHER21-JAN-2026 00:0022-JAN-2026 00:00Correa, DanielRemove CM01 endcap support structure (Correa) Open the CM01 big bellow and close the gate valve in CM01 (Coy)Zhou, Feng
18043826MFDMActiveYesNoOTHER01-APR-2026 00:0001-APR-2026 00:00Correa, DanielRecovery for CM01 endcap structure & its accessories , reinstall CM01 endcap support structure (MFD-Correa)Zhou, Feng
1804383MFDMActiveYesNoOTHER05-JAN-2026 00:00 - Correa, Danielremove gun & buncher water hoses and blow out, and reinstall later remove the gun SS water tubing and reinstaZhou, Feng
1804386OTHERActiveYesNoOTHER16-DEC-2025 00:00 - Gassner, Georg L.metrology laser table, laser Mirror M1Zhou, Feng
1804387OTHERActiveYesNoOTHER05-JAN-2026 00:00 - Benwell, Andydisconnect gun & buncher RF probes, and reinstall later Remove buncher WGs, and reinstall later Reinstall gZhou, Feng
1804388OTHERActiveYesNoOTHER02-FEB-2026 00:0002-MAR-2026 00:00Reed, Dentell V.remove loadlock transverse arm (from central chamber flange to aisle) remove the bottom chamber of the centraZhou, Feng
1804389OTHERActiveYesNoOTHER08-JAN-2026 00:00 - Karimian, Sherwindisconnect NEGs and Ion pumps cables and secure them, and reconnect them later replace cables for some hot fiZhou, Feng
1782552CTLActiveYesNoPROF06-APR-2026 00:0016-JAN-2027 00:00Curtis, Courtney A.Replace YAG01BCurtis, Courtney A.
1822301CTLActiveYesNoPROF15-APR-2026 00:0017-APR-2026 00:00Curtis, Courtney A.Re-install YAG01b cameraCurtis, Courtney A.
18043827MFDMActiveYesNoRF24-APR-2026 00:0024-APR-2026 00:00Correa, DanielReinstall WG support structure (MFD - Correa)Zhou, Feng
1824791ADSOActiveYesNoSAFETY09-FEB-2026 00:0009-FEB-2026 00:00Van Hoover, ZoeADSO inspection of S0 manway alcove fall protection SRLVan Hoover, Zoe
18043829CTLActiveYesNoTOROIDS06-JAN-2026 00:00 - Murphy, James Matthewreconnect cables for Toroid IM01Zhou, Feng
18043822MFDVActiveYesNoVACUUM30-JAN-2026 00:0013-FEB-2026 00:00Reed, Dentell V.Replace gun window, NEGs/IPs, & RGAZhou, Feng
18043823MFDVActiveYesNoVACUUM18-FEB-2026 00:0025-FEB-2026 00:00Reed, Dentell V.LEB works - 1. Replace the gate valves, VV01 and VV02 2. Replace 2x NEG pumps (Z400) 3. Add 1x NEG/Ion pumpZhou, Feng
18043824MFDVActiveYesNoVACUUM27-FEB-2026 00:0018-MAR-2026 00:00Reed, Dentell V.Gun & LEB bake-out - 1. Bakeout preparation (VAC/Bostic/TC/Feng) 2. cool down & Remove foils and equipment (Zhou, Feng
18043828CTLActiveYesNoVACUUM03-MAR-2026 00:00 - Karimian, SherwinRe certify Vacuum PLC GUNBZhou, Feng
1815192CTLActiveYesNoVACUUM13-JAN-2026 00:00 - Lai, Chinh DucInstall new secondary PLC crate, power supply panel, and wire cross-connects in rack to accommodate new Gamma Karimian, Sherwin
18043820MFDMActiveYesNoWATER13-JAN-2026 00:0016-JAN-2026 00:00Correa, DanielRemove gun water hoses & blowout (MFD - Correa) Remove the shielding to protect gun windows (MFD - Correa) RZhou, Feng
18043825MFDMActiveYesNoWATER23-MAR-2026 00:0026-MAR-2026 00:00Correa, DanielRecovery Gun + LEB - 1. reconnect SS water tubes (MFD-Correa) 2. reconnect water hoses (MFD-Correa) 3. reZhou, Feng
1804385CTLCompleteYesNoLASER16-DEC-2025 00:00 - Alverson, Shawn Christopherdisconnect s0 laser control cable Zhou, Feng
1815211CTLCompleteYesNoMOVERS06-JAN-2026 00:00 - Bong, JamesDisconnect, tag, and coil solenoids motion control cables in preparation for LDT workMontironi, Alex
1815212CTLCompleteYesNoMOVERS06-JAN-2026 00:00 - Bong, JamesDisconnect, tag, and coil collimator/YAG motion cables in preparation for LDT gun reworkMontironi, Alex
18043810CBLCompleteYesNoOTHER05-JAN-2026 00:00 - Boucher, Salimedisconnect cables around CM01 endcap area and organize these cables remove the vertical cable tray installZhou, Feng
18043814CTLCompleteYesNoOTHER06-JAN-2026 00:00 - Hoobler, SonyaDisconnect cables for BPM1B and BPM2BZhou, Feng
18043818CTLCompleteYesNoOTHER06-JAN-2026 00:00 - Murphy, James MatthewDisconnect cables for toroid IM01Zhou, Feng
1804382MFDMCompleteYesNoOTHER17-DEC-2025 00:00 - Correa, Danielremove s0 laser table Zhou, Feng
1804384CTLCompleteNoNoOTHER17-DEC-2025 00:00 - Lai, Chinh Ducremove s0 gun u-shape waveguide relevant RTDs Zhou, Feng
1806341AEGCompleteYesNoOTHER19-DEC-2025 00:00 - Gassner, Georg L.Map position of parts for the LCLS-II load lockGassner, Georg L.
1807401CEFASCompleteYesNoOTHER17-DEC-2025 00:0018-DEC-2025 00:00Poitier, SebastianASG to supply and install new temperature and humidity sensors on the outside of the laser enclosure. The sensPoitier, Sebastian
1815601CTLCompleteYesNoPROF06-JAN-2026 00:00 - Curtis, Courtney A.Disconnect, remove/move YAG01b cables and camera system Camera was decided to be split off as another part neCurtis, Courtney A.
1815602CTLCompleteNoNoPROF22-JAN-2026 00:00 - Curtis, Courtney A.Remove YAG01b camera systemCurtis, Courtney A.
1815191CTLCompleteYesNoVACUUM12-JAN-2026 00:00 - Karimian, SherwinReplace SAES SIP Power controllers in L2KA00-02 and L2KA00-03 (11 total) with Gamma controllers (3 total) in tKarimian, Sherwin
1823691CTLCompleteYesNoVACUUM01-JAN-2026 00:0030-JAN-2026 00:00Sanchez, DanielDisconnecting cables L2A02326 from the controller side in the gallery Rack L2KG00-15 to support ongoing sectorSanchez, Daniel
1802291CTLDropNoNoPROF09-JAN-2026 00:00 - Curtis, Courtney A.Remove unused YAG01B pneumatic control cable. Cable shop is removing cable.Curtis, Courtney A.

LINAC WEST (S1-9)
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1821801SWEActiveNoNoARCHIVER30-SEP-2026 00:00 - Summers, TashaReminder to resume PVs by end of LDTSummers, Tasha
1813841CTLActiveYesNoATCA16-DEC-2025 00:0009-JAN-2026 00:00Vu, Minh KL2KG03-6033 P30 shm-l2b-sp02-1/5 (M300). Reset "force close" handle on slot 2 carrier.Vu, Thuy Mong
1814432CTLActiveYesNoATCA19-JAN-2026 00:0027-FEB-2026 00:00Vu, Minh KSEC00-SEC05 Install NIC card 10G for all 8100s that connect to ATCA - SC ONLY 1. L2KA00-0542 Alcove cpu-guVu, Thuy Mong
1782341SSEDActiveNoYesBCS19-JUN-2025 10:0021-JUL-2025 18:00Cobau, BillDownload new firmware to all of the LCLS II BCS LBLM chassis that will filter out the noise from the SC BEAM oCobau, Bill
1616021CTLActiveYesNoDUMPS/COLLIMATORS20-JAN-2026 00:00 - Bong, Jamesinspect and remount collimator termination panel for CEHTRBalakrishnan, Namrata
1747881CEFOIActiveYesNoODM12-JAN-2026 00:0006-FEB-2026 00:00Delgado, SalInstallation of 1/8" air collecting tubes for HE ODM at penetrations S08-09, S09-09 and S10-04. Tubes drop dowNicolas, Ludovic Y.
1747882CEFOIActiveYesNoODM21-JUL-2025 00:0015-SEP-2026 00:00Delgado, SalLI08 move ODM controller from 08-06 to penetration 08-09 (Ch3). This includes the Oxigraf air tubing going dowNicolas, Ludovic Y.
1747883CEFOIActiveYesNoODM20-JAN-2026 00:0001-JUN-2026 00:00Delgado, SalRemove Oxigraf air lines from Pen 07-11 and install replacement ones at Pen 07-10. W.O for CEFOI - FWKD0117Nicolas, Ludovic Y.
1805201SSEDActiveYesNoODM05-JAN-2026 00:0001-OCT-2026 00:00Nicolas, Ludovic Y.Installation of 4x4 supports in Sector 08 and Sector 09 AORs as support for ODH blue strobes. Supports tie in Nicolas, Ludovic Y.
1805202SSEDActiveYesNoODM05-JAN-2026 00:0031-MAR-2026 00:00Nicolas, Ludovic Y.Pull wires in fire conduits of Linac West Sectors 08, 09 and 10, install the strobes/horns and connect them.Nicolas, Ludovic Y.
1805203SSEDActiveYesNoODM05-JAN-2026 00:0001-OCT-2026 00:00Nicolas, Ludovic Y.Installation of 4x4 steel box support for ODH blue horn/strobe at the Sector 09 PPS entrance in Klystron GalleNicolas, Ludovic Y.
1805204SSEDActiveYesNoODM05-JAN-2026 00:0001-OCT-2026 00:00Nicolas, Ludovic Y.Installation of one 4x4 steel box support for ODH blue strobe/horn at the PPS entrance of the S10 adit (outsidNicolas, Ludovic Y.
18084112SSEDActiveYesNoODM01-OCT-2026 00:0018-DEC-2026 00:00Nicolas, Ludovic Y.Turn the Linac ODM System back ON on all sectors 00 to 10.Perez, Jase
18084113SSEDActiveYesNoODM02-NOV-2026 00:0018-DEC-2026 00:00Nicolas, Ludovic Y.Linac ODM System certification (IAT).Perez, Jase
18084119SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install new S07 UltraFlow Duo Oxigraf, its cabinet and wire it for operations at Penetration P07-10. The S07Perez, Jase
18084120SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install new S08 UltraFlow Duo Oxigraf, its cabinet and wire it for operations at Penetration P08-09. Perez, Jase
18084121SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install new S09 UltraFlow Duo Oxigraf, its cabinet and wire it for operations at Penetration P09-09.Perez, Jase
18084122SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install new S10 UltraFlow Duo Oxigraf, its cabinet and wire it for operations at Penetration P10-04.Perez, Jase
18084123SSEDActiveYesNoODM16-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install ODM system panels and wiring in L2KA08-08 rackPerez, Jase
18084124SSEDActiveYesNoODM16-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install ODM system panels and wiring in L2KA09-14 rackPerez, Jase
18084125SSEDActiveYesNoODM16-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install ODM system panels and wiring in L2KA10-17 rackPerez, Jase
18155710SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install S05 UltraFlow Duo OxigrafNicolas, Ludovic Y.
18155711SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove S06 Original OxigrafNicolas, Ludovic Y.
18155712SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install S06 UltraFlow Duo OxigrafNicolas, Ludovic Y.
1815571SSEDActiveYesNoODM05-JAN-2026 00:0016-DEC-2026 00:00Nicolas, Ludovic Y.Remove S00 original Oxigraf to allow for its swap with UltraFlow modelNicolas, Ludovic Y.
1815576SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install S03 UltraFlow Duo OxigrafNicolas, Ludovic Y.
1815577SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove S04 Original OxigrafNicolas, Ludovic Y.
1815578SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install S04 UltraFlow Duo OxigrafNicolas, Ludovic Y.
1815579SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove S05 Original OxigrafNicolas, Ludovic Y.
1757023RPFOActiveNoNoOTHER09-FEB-2026 00:00 - Frosio, ThomasRP inspections - -Injector West entry maze -S0 to S10 klystron gallery -Inside S10 ADIT -S10 wall SC sideFrosio, Thomas
1795835AEGActiveNoNoOTHER10-FEB-2026 00:00 - Gassner, Georg L.3D scan of S7 - S10 while it is emptyGassner, Georg L.
1802194MFDMActiveYesYesOTHER05-JAN-2026 00:0030-SEP-2026 00:00Atkinson, Richard D.Remove BRB1 dipole and CDOG collimator and relocate it downstream by S10 wall in linac-west Remove BRB2 dipWhite, Dominique A
1802197MFDVActiveYesNoOTHER18-DEC-2025 00:0030-SEP-2026 00:00Diaz, Gregory L.Disconnect and remove UHV beam-line vacuum components of the dogleg in linac west S7 through S10 wall. FolloWhite, Dominique A
1804591OTHERActiveYesYesOTHER22-JAN-2026 00:0013-MAR-2026 00:00White, Dominique AInstall 7 sets of Cm stands in housing between S7 and S8. SOW steps - 1. Drill and install anchors (contractChecchin, Mattia
1804592OTHERActiveYesYesOTHER22-JAN-2026 00:0030-APR-2026 00:00White, Dominique AInstall L3-L4 transition and scavenging pump anchors in S7. SOW steps - 1. drill holes and install anchors (Checchin, Mattia
1804593OTHERActiveYesNoOTHER19-JAN-2026 00:0030-APR-2026 00:00Checchin, MattiaDemo 4 concrete pads in the S7 housing.Checchin, Mattia
18084129AMGActiveYesYesOTHER02-FEB-2026 00:0020-MAR-2026 00:00Perez, JaseProject to install new duct work, support stands, etc. for new S10 adit AHU Perez, Jase
1808416OTHERActiveYesNoOTHER02-FEB-2026 00:0027-FEB-2026 00:00Perez, JaseThe existing Sector 07/08 PPS Gate will get demo'd during the long downtime.Perez, Jase
1810381MFDMActiveYesNoOTHER02-FEB-2026 00:0030-JUN-2026 00:00Checchin, MattiaInstall ceiling waveguides in penetrations P07-09 through P10-04 (P09-09 and P09-10 excluded)Checchin, Mattia
1810382MFDMActiveYesNoOTHER01-MAR-2026 00:0030-SEP-2026 00:00Checchin, MattiaInstall vertical waveguides in penetrations P07-09 through P10-04Checchin, Mattia
1810881MFDMActiveYesNoOTHER09-MAR-2026 00:0028-AUG-2026 00:00Atkinson, Richard D.Unload Cryomodules at S10 adit and transport to final location in HousingWhite, Dominique A
1810882OTHERActiveYesNoOTHER09-MAR-2026 00:0028-AUG-2026 00:00Gassner, Georg L.Align Cryomodules once they've been placed on stands in housingWhite, Dominique A
1810883OTHERActiveYesNoOTHER09-MAR-2026 00:0028-AUG-2026 00:00Johnson, Scot L.Support Unload of Cryomodules at S10 adit during LDTWhite, Dominique A
1810884MFDMActiveYesNoOTHER09-MAR-2026 00:00 - Chase, RandallCryomodule interconnect welds and inspectionWhite, Dominique A
1810887MFDMActiveYesNoOTHER01-JUN-2026 00:00 - White, Dominique APressure test of cryo lines after interconnect welds are completeWhite, Dominique A
1810888MFDMActiveYesNoOTHER01-JUN-2026 00:00 - Atkinson, Richard D.Cryomodule interconnect close upWhite, Dominique A
1813471RPFOActiveYesNoOTHER30-NOV-2026 00:0018-DEC-2026 00:00Najera, Melanie AWalkthrough to update RP survey maps for LINAC West at end of LDT. -
1815041MFDMActiveYesNoOTHER12-JAN-2026 00:00 - Atkinson, Richard D.After demo, Install LCLS-II stands and devices in S10 West. -
1815042MFDVActiveYesNoOTHER09-FEB-2026 00:00 - Diaz, Gregory L.Install drift tubes after stands installation -
18195818CBLActiveYesNoOTHER20-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelCable Demo P08-06 to P08-17 Hernandez, Joel
18195819CBLActiveYesNoOTHER20-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelCable Demo S9US (Penetrations 1-8) Hernandez, Joel
18195820CBLActiveYesNoOTHER20-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelCable Demo S9DS Penetrations 9-16 Hernandez, Joel
18195821CBLActiveYesNoOTHER20-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelCable Demo S10 (tunnel) Hernandez, Joel
18195822CBLActiveYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelCable Demo S7-PF Tunnel Hernandez, Joel
18195823CBLActiveYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelCable Demo S7-UHV (Tunnel Demo) Hernandez, Joel
18195824CBLActiveYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelCable Demo P08-01 to P08-5 (Tunnel) Hernandez, Joel
18195825CBLActiveYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelShift Cable Tray P08-06 to P08-17 Hernandez, Joel
18195826CBLActiveYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelShift Cable Tray S9 Up Stream Hernandez, Joel
18195827CBLActiveYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelShift Cable Tray S9 Down Stream Hernandez, Joel
18195828CBLActiveYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelShift Cable Tray S10 Tunnel Hernandez, Joel
18195829CBLActiveYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelShift Cable Tray S7-PF S7P8-7P10 Hernandez, Joel
18195830CBLActiveYesNoOTHER20-JAN-2026 00:0027-FEB-2026 00:00Hernandez, JoelShift Cable Tray S7-UHV S7P9-S8-1 Hernandez, Joel
18195831CBLActiveYesNoOTHER29-JAN-2026 00:0027-FEB-2026 00:00Hernandez, JoelShift Cable Tray P08-01 to P08-05 Hernandez, Joel
18195832CBLActiveYesNoOTHER01-FEB-2026 00:0027-FEB-2026 00:00Hernandez, JoelShift Cable Tray @ PPS Gate between Sector 7-8 tunnel. Contractors need to remove wall before this work can beHernandez, Joel
1823131RPFOActiveYesNoOTHER09-MAR-2026 00:0011-MAR-2026 00:00Najera, Melanie AReplace RP ozone sensor in Sector 2Najera, Melanie A
1823471MFDMActiveYesNoOTHER04-MAY-2026 00:0030-SEP-2026 00:00Atkinson, Richard D.Remove, inspect for proper fit, clean, and reinstall the following Cryomodule CD valves - CM01, CM08, CM10, CMGalindo, Alondra
1784642SSEDActiveYesNoPPS17-DEC-2025 00:0015-DEC-2026 00:00Nicolas, Ludovic Y. Install green light at S10 Adit entrance. PPS (outside)Nicolas, Ludovic Y.
1815841CBLActiveYesYesPPS18-DEC-2025 00:00 - Hernandez, JoelCut existing cable ID LHE07780 below and above penetration Sector 8 Penetration 12. Install New junction box iHernandez, Joel
1815842CBLActiveYesYesPPS17-DEC-2025 00:00 - Hernandez, JoelCut existing cable ID's LHE07781,2,3 (12PR Trunks) Install new junction box above and below Sector 9 P 4 InstaHernandez, Joel
1815844CBLActiveYesNoPPS18-DEC-2025 00:00 - Hernandez, JoelInstall New RP Radiation Monitoring cable Sector 10 P8Hernandez, Joel
1815846CBLActiveYesNoPPS06-JAN-2026 00:00 - Hernandez, JoelInstall New Copper Pipe at Sector 10 P8, S7P11, S8P12Hernandez, Joel
1800002CTLActiveYesNoPROF15-JUL-2026 00:00 - Curtis, Courtney A.Reconnect and test OTRDOG in new locationCurtis, Courtney A.
18120510CTLActiveYesNoPROF05-JAN-2026 00:00 - Mock, Jeremy ADisconnect MPS cables in support of S7-10 HE Demo WorkSaraf, Shweta
1812055CTLActiveYesNoPROF07-JAN-2026 00:00 - Lam, Briant K.Disconnect Magnets cables in LCLS-II DOGLEG in support of S7-10 HE Demo WorkSaraf, Shweta
1812057CTLActiveYesNoPROF05-JAN-2026 00:00 - Sanchez, DanielDisconnect Timing cables in LCLS-II DOGLEG in support of S7-10 HE Demo WorkSaraf, Shweta
1815081CTLActiveYesNoPROF16-MAR-2026 00:00 - Curtis, Courtney A.TS&R OTRDG02 Target LampCurtis, Courtney A.
1815091CTLActiveYesNoPROF16-MAR-2026 00:00 - Curtis, Courtney A.TS&R Voltage issue with YAGH2 to filters. Suspect issue with control cable when connected to optics box.Curtis, Courtney A.
1597552AMRFActiveYesNoRF13-JUL-2026 00:0022-JUL-2026 00:00Nguyen, BinhDowntime- LCLS-II Gun LLRF install new RF interlock chassis for EPS. Downtime job.Benwell, Andy
1597554AMRFActiveNoNoRF20-APR-2026 00:0011-DEC-2026 00:00Benwell, AndyInstall parallel LLRF system for the LCLS-II gun, test during downtimeBenwell, Andy
1702651AMRFActiveYesNoRF18-JUN-2026 00:00 - Benwell, AndyDowntime- CM28 Cav 1 - Stepper motor limit switch bypass - if direction of detune is confidently known, we couBenwell, Andy
1759244AMRFActiveYesNoRF12-JAN-2026 00:0015-MAY-2026 00:00Kelly, Richard SCM33 - 8 try to detune cavity approximately 30 kHz with a box at the CM during a PAMM. This will be a 'blind'Benwell, Andy
1770362AMRFActiveYesNoRF01-JUN-2026 00:0001-NOV-2026 00:00Benwell, AndySome SC RF BSA quantities are not showing up in the EPICS control screens.Benwell, Andy
1795911AMRFActiveYesNoRF08-JAN-2026 00:0028-JAN-2026 00:00Nguyen, Phillip P.CM09 Cavity 8, monitor stepper and coupler temperatures. Check for any poor connections leading to temperatur -
1811851AMRFActiveYesNoRF14-JAN-2026 00:0028-JAN-2026 00:00Kelly, Richard SCM27-3 faulted on STT. Set offline. Check with the test box. -
1813131AMRFActiveYesNoRF16-DEC-2025 00:0016-JAN-2026 00:00Kelly, Richard SCMH2 Cav2 - check SSA characterization for signs of more than enough drive and lower SSA drive max to match. -
1814941AMRFActiveYesNoRF07-JAN-2026 00:0014-JAN-2026 00:00Nguyen, Phillip P.CM09-8 stepper temperature out of tolerance and offline. Check with the test box. This station has a hist -
1815251AMRFActiveYesNoRF16-DEC-2025 00:00 - Nguyen, Phillip P.CM 34 RFS2B and PRCB check and reseat the RFS2B and PRCB connection at K1. A poor connection here can possiblBenwell, Andy
1678102CTLActiveYesNoSRF01-APR-2026 00:0031-JUL-2026 00:00Wilson, AndrewVerify operation as part of calibration after sensor replacement let by Rob Coy.Wilson, Andrew
1775481CTLActiveNoNoSRF02-MAR-2026 00:0029-MAY-2026 00:00Wilson, AndrewTroubleshoot CM29 cavity 5 heater system -Look for loose wiring on power supply and P24 -Measure voltage of Wilson, Andrew
1775482CTLActiveNoNoSRF02-MAR-2026 00:0029-MAY-2026 00:00Wilson, AndrewReplace CM29 cavity 5 heater power supply Coordinate with cryo control room. LOTO (cord and plug) power to CMWilson, Andrew
1775483CTLActiveNoNoSRF02-MAR-2026 00:0029-MAY-2026 00:00Wilson, AndrewTroubleshoot CM26 cavity 3 heater system -Look for loose wiring on power supply and P23 -Measure voltage of Wilson, Andrew
1775484CTLActiveNoNoSRF02-MAR-2026 00:0029-MAY-2026 00:00Wilson, AndrewReplace CM26 cavity 3 heater power supply Coordinate with cryo control room. LOTO (cord and plug) power to CMWilson, Andrew
1775485CTLActiveYesNoSRF02-MAR-2026 00:0029-MAY-2026 00:00Wilson, AndrewTroubleshoot CM04 cavity 7 heater system -Look for loose wiring on power supply and P24 -Measure voltage of Wilson, Andrew
1775486CTLActiveYesNoSRF02-MAR-2026 00:0029-MAY-2026 00:00Wilson, AndrewReplace CM04 cavity 7 heater power supply Coordinate with cryo control room. LOTO (cord and plug) power to CMWilson, Andrew
1812771MFDVActiveYesNoSRF09-FEB-2026 00:0014-FEB-2026 00:00Coy, RobertRemove BLA from CM33-34 interconnectCoy, Robert
1785751MFDVActiveYesNoVACUUM16-DEC-2025 00:0006-JAN-2026 00:00Diaz, Gregory L.L1B, He Scav Cart L1B -0295 CDA interlock fault troubleshooting due to either sensor is not functioning properDiaz, Gregory L.
1785761MFDVActiveYesNoVACUUM16-DEC-2025 00:0006-JAN-2026 00:00Diaz, Gregory L.L3, He Scav Carts CDA interlock faults troubleshooting at 6 locations. There was an unexpected function of theDiaz, Gregory L.
1802192MFDMActiveYesNoVACUUM05-JAN-2026 00:0031-JAN-2026 00:00Atkinson, Richard D.Support removal of L3 Extension during LDT.White, Dominique A
1810885MFDVActiveYesNoVACUUM09-MAR-2026 00:00 - Reed, Dentell V.Leak Check of interconnects after weldWhite, Dominique A
1810886MFDVActiveYesNoVACUUM09-MAR-2026 00:00 - Reed, Dentell V.Particle Free interconnects of CryomodulesWhite, Dominique A
1825211CTLActiveYesNoVACUUM06-FEB-2026 00:00 - Karimian, SherwinConnect existing vacuum control cables for Pumpcart 1195 in Sector 3Karimian, Sherwin
18084117CEFOMActiveYesNoWATER20-JAN-2026 00:0020-FEB-2026 00:00Harrison, William GerardFacilities to support the demo of MAG LCW in the following areas - 1. Sector 07 of the tunnel/housing 2. SecPerez, Jase
18084130CEFFTActiveNoNoWATER09-FEB-0026 00:0013-MAR-0026 00:00Perez, JaseRequesting fire tech support to drain the fire suppression line at penetrations 7-6 and 7-14 that will impact Perez, Jase
1823101CEFOMActiveYesNoWATER02-FEB-2026 00:0001-APR-2026 00:00Cardenas, FernandoDemolition / Removal of the now-disconnected and abandoned piping and associated supports in S9. Piping is Marshall, Dave
1823102CEFOMActiveYesNoWATER02-FEB-2026 00:0001-APR-2026 00:00Cardenas, FernandoThe sector 5 mechanical alcove supplies Mag LCW water both east and west of the alcove. Now that LPI has modiMarshall, Dave
1823103CEFOMActiveYesNoWATER02-FEB-2026 00:0001-APR-2026 00:00Cardenas, FernandoDemolition / Removal of the now-disconnected and abandoned piping and associated supports in S5 to S7. The Marshall, Dave
1814431CTLCompleteYesNoATCA16-DEC-2025 00:0009-JAN-2026 00:00Vu, Minh KSEC06-SEC10 Install NIC card 10G for all 8100s that connect to ATCA - SC ONLY 1. L2KG06-6044 P4 cpu-l3b-spVu, Thuy Mong
1814731CTLCompleteYesNoATCA17-DEC-2025 00:0019-DEC-2025 00:00Urbina, MariaSEC07-SEC10 Power down ATCAs and servers for HE work., except RF HUT in SEC10 (SC only, not FACET)Vu, Thuy Mong
1799537HWPHCompleteYesNoBLEN12-JAN-2026 00:0030-JAN-2026 00:00Kruchinin, KonstantinInstall a box to house the BLEN amplifiers and a power supply under the beamline, with lead shielding.Kruchinin, Konstantin
1814461PEMCompleteYesNoDC MAGNETS16-DEC-2025 00:0009-JAN-2026 00:00Herr, ChangLOTO LCLS-II EXT and DOGLEG magnet power supplies in racks - L2KG08-51 thru 56 L2KG14-51 thru 52 Lam, Briant K.
1814462PEMCompleteYesYesDC MAGNETS17-DEC-2025 00:0009-JAN-2026 00:00Herr, ChangAirgap LCLS-II DOGLEG magnets BRB1 and BRB2 only. These are BCS monitored, requiring a RSWCF.Lam, Briant K.
1814463PEMCompleteYesNoDC MAGNETS05-JAN-2026 00:0016-JAN-2026 00:00Herr, ChangAirgap LCLS-II EXT magnets from QX01 to BCXDLU4. Orange vest required and procedure required. Full list - QLam, Briant K.
1814464PEMCompleteYesNoDC MAGNETS17-DEC-2025 00:0009-JAN-2026 00:00Lam, Briant K.Airgap LCLS-II DOGLEG magnets from YCDOG0 to YCBP12, excluding BRB1 and BRB2 (in job 2 with RSWCF requirementsLam, Briant K.
1814465PEMCompleteYesNoDC MAGNETS12-JAN-2026 00:0016-JAN-2026 00:00Erebia, Agapito PeteValve off and disconnect PCW to racks L2KG08-51 thru 56. Blow out residual water in rack heat exchanger.Lam, Briant K.
1819751CEFECompleteYesNoELECTRICITY12-JAN-2026 00:00 - Hart, JeffProvide temporary power to S10 Adit tunnel through penetration 10-8 conduit.Hart, Jeff
1811792CTLCompleteYesNoMOVERS06-JAN-2026 00:00 - Bong, JamesRemove J-panel and pigtails for CEDOG in S07 and store for reinstallation.Bong, James
1815791CBLCompleteYesNoNETWORK INFRASTRUCTURE16-DEC-2025 00:00 - Hernandez, JoelJob #HENT11 for Arjun and Charley Installation of x7 network cables and terminations from KF10-8A to Z=3106. -
1815792CBLCompleteYesNoNETWORK INFRASTRUCTURE16-DEC-2025 00:00 - Hernandez, JoelJob #HENT10 Installation of Network cables from Sector 10 Gallery rack LKG10 rack #24 to Sector 10 Adit for Do -
1815811CBLCompleteYesNoNETWORK INFRASTRUCTURE16-DEC-2025 00:00 - Hernandez, JoelInstallation of Network Cables from Sector 10 gallery and Alcove to Sector 10 Adit. These cables are being putHernandez, Joel
18084118SSEDCompleteYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove unused ODM system panels inside L2KA08-05 PPS Rack (back).Perez, Jase
1815771SSEDCompleteYesYesODM09-JAN-2026 00:00 - Nicolas, Ludovic Y.Power down the Linac West ODM prior to the S7-S10 rack power outage.Cyterski, Matt
1802193MFDVCompleteNoNoOTHER16-DEC-2025 00:0023-JAN-2026 00:00Diaz, Gregory L.Vent beam-line from gate valve at beginning of dogleg to gate valve at beginning of S12.White, Dominique A
1802195MFDMCompleteYesYesOTHER16-DEC-2025 00:0009-JAN-2026 00:00Atkinson, Richard D.S10 wall shielding installation. Once the UHV beam-line is vented, vacuum team will remove one beam-line seWhite, Dominique A
1806581CBLCompleteYesNoOTHER16-DEC-2025 00:0030-JAN-2026 00:00Hernandez, JoelStage strut and hardware in Sector 7-10, for cable shifting work as per HE drawings.Hernandez, Joel
1811161RPFOCompleteYesNoOTHER16-DEC-2025 00:0019-DEC-2025 00:00Najera, Melanie ARemove ozone sensor box from tunnel at 07-11Najera, Melanie A
1811171RPFOCompleteYesYesOTHER16-DEC-2025 00:0019-DEC-2025 00:00Harris, Anne M.Remove RDM at Sec 7 (before SEC 7-10 demo) with it's pre-amp from the housing at Sec 7-11, and remove the dispHarris, Anne M.
1812421RPFOCompleteYesNoOTHER16-DEC-2025 00:0019-DEC-2025 00:00Harris, Anne M.Fiber optic cables (in bags with thermometer) for radiation hardness testing at SEC 1, across fromPC0 shieldinHarris, Anne M.
1813751MFDMCompleteYesYesOTHER09-JAN-2026 00:0017-JAN-2026 00:00Atkinson, Richard D.Remove shield caps from penetrations listed below and coordinate with riggers to move the caps to B15 parking Loo, Alysson
1814321OTHERCompleteYesNoOTHER16-DEC-2025 00:0016-DEC-2025 00:00Griffie, LarryAD118P on 12/16 @ 1pmGriffie, Larry
1814322OTHERCompleteYesNoOTHER17-DEC-2025 00:0017-DEC-2025 00:00Griffie, LarryAD118P on 12/17 @ 9amGriffie, Larry
1819581CBLCompleteYesNoOTHER13-JAN-2026 00:0023-JAN-2026 00:00Hernandez, JoelGallery Controls Demo P08-06 to P08-17. All cables Hernandez, Joel
1819582CBLCompleteYesNoOTHER14-JAN-2026 00:0023-JAN-2026 00:00Hernandez, JoelTray Demo Sec 8 P6 Hernandez, Joel
1819583CBLCompleteYesNoOTHER13-JAN-2026 00:0023-JAN-2026 00:00Hernandez, JoelRack Relocation Sec 8 P6, racks will go back to B15 to be reconfigured Hernandez, Joel
1819584CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelTray Demo Sec 8 P12 Hernandez, Joel
1819585CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelRack Relocation Sec 8 P12 Hernandez, Joel
1819586CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelGallery Controls Demo S9US (Pen Sec 9 P1-8) All system cables from gallery racks and alcoves to penetrationsHernandez, Joel
1824861AEGCompleteNoNoOTHER05-FEB-2026 00:0005-FEB-2026 00:00Gassner, Georg L.Layout the location of the new PPS gate at S7Gassner, Georg L.
1802196MFDMCompleteYesYesPPS17-DEC-2025 00:0007-JAN-2026 00:00Diaz, Gregory L.Sec 10 adit concrete double doors - remove the floor threshold shielding shims. This is needed to remove the fWhite, Dominique A
1811181RPFOCompleteYesYesPPS07-JAN-2026 00:0009-JAN-2026 00:00Harris, Anne M.Remove neutron and photon BSOICS (BSOLNW10 and BSOLNW11n) located in Sec 7 (prior to Sec 7- Sec10 demo).Harris, Anne M.
1815843CBLCompleteYesNoPPS16-DEC-2025 00:00 - Hernandez, JoelRemove Copper Pipe at penetration's Sec 7P11 & Sec 8 P12Hernandez, Joel
1815845CBLCompleteYesNoPPS17-DEC-2025 00:00 - Hernandez, JoelRemove & Save RP Cable at Sector 7 P12 Near RDM (Grey, Do Not cut)Hernandez, Joel
1812051CTLCompleteYesNoPROF16-DEC-2025 00:00 - Curtis, Courtney A.Disconnect Profile Monitor cables in LCLS-II DOGLEG area support HE Demo for S7-10Saraf, Shweta
1812052CTLCompleteYesNoPROF17-DEC-2025 00:0019-DEC-2025 00:00Murphy, James MatthewDisconnect BPM cables in LCLS-II DOGLEG area in support of S7-10 HE Demo WorkSaraf, Shweta
1812053CTLCompleteYesNoPROF05-JAN-2026 00:00 - Sanchez, DanielDisconnect Vacuum cables in S7-10 in support of S7-10 HE Demo WorkSaraf, Shweta
1812054CTLCompleteYesNoPROF05-JAN-2026 00:00 - Bong, JamesDisconnect Collimator (CEDOG) and fast wire scanner (WSBP1) long haul cables in LCLS-II DOGLEG in support of SSaraf, Shweta
1812056CTLCompleteYesNoPROF05-JAN-2026 00:00 - Karimian, SherwinDisconnect Temperature cables in S7-10 in support of S7-10 HE Demo WorkSaraf, Shweta
1812058CTLCompleteYesNoPROF05-JAN-2026 00:00 - Shetty, ArjunDisconnect Network cables in support of S7-10 HE Demo WorkSaraf, Shweta
1812059CTLCompleteYesNoPROF18-DEC-2025 00:00 - Taylor, ZackDisconnect and mark the following cables in the LLRF racks in support of S7-10 HE Demo Work. CM31-CAVITY 1-4 Saraf, Shweta
1815851CBLCompleteYesNoRADIOS17-DEC-2025 00:0027-FEB-2026 00:00Hernandez, JoelRelocate Antenna Amplifier from Gallery to Tunnel in Sector 9 P12 Install New cables to existing long hauls, m -
14482691CTLCompleteNoNoVACUUM16-DEC-2025 00:00 - Karimian, SherwinReplace TCP 350 Turbo Controller in L2KA03-0130 due to Error 993Karimian, Sherwin
1802191MFDVCompleteYesNoVACUUM05-JAN-2026 00:0031-JAN-2026 00:00Diaz, Gregory L.Removal of Particle free beamline (L3 Extension) from housing during LDT. Only valve extension will remain in White, Dominique A
1814601CTLCompleteYesNoVACUUM16-DEC-2025 00:00 - Karimian, SherwinZero out Pirani channels on gauge controllers to resolve readback issueKarimian, Sherwin
1815611CBLCompleteYesNoVACUUM16-DEC-2025 00:00 - Hernandez, JoelInstall temporary CAT6 cable from South wall, at Z location near Pen 7-06, to North wall near L3 endcap deviceKarimian, Sherwin
1815612CTLCompleteYesNoVACUUM16-DEC-2025 00:00 - Karimian, SherwinTemporary setup of DIGI, ion pump controller, and gauge controller in housing to support local monitoring of LKarimian, Sherwin
1815613CTLCompleteYesNoVACUUM16-DEC-2025 00:00 - Karimian, SherwinLock close the following PF vacuum valves to support CM warm-up and LDT work - VVPG -GUNB -941 VVPG -HTR -Karimian, Sherwin
1814732CTLDropYesNoATCA08-JAN-2026 00:0009-JAN-2026 00:00Tang, VanSEC07-SEC10 Power restart ATCAs and servers after HE work, except RF HUT in SEC10 (SC only, not FACET)Vu, Thuy Mong
1810911MEDropYesNoDC MAGNETS16-DEC-2025 00:0017-DEC-2025 00:00Anderson, Scott D.Measure the water flow for DOG magnets that are not planned to go to the magnetic measurements shop during theAnderson, Scott D.
1822231ADSODropNoYesOTHER22-JAN-2026 00:0023-JAN-2026 00:00Andrews, AnthonyUnlock ADSO lock at shed above the S10 Adit. Access is needed for contractors.Andrews, Anthony
1800001CTLDropNoNoPROF16-DEC-2025 00:0030-JAN-2026 00:00Curtis, Courtney A.Test OTRDOG status, then disconnect cables from device and in rack for device and rack move for HE---Dropped fCurtis, Courtney A.
1780431PEMRollYesNoDC MAGNETS21-JUL-2025 00:0029-AUG-2025 00:00Lam, Briant K.CM22 - Inspect magnet power and voltage tap wiring to troubleshoot false quench faults.Lam, Briant K.
1780432PEMRollYesNoDC MAGNETS21-JUL-2025 00:0022-AUG-2025 00:00Lam, Briant K.CM30 - Inspect magnet power and voltage tap wiring to troubleshoot false quench faults.Lam, Briant K.

LINAC WEST GALLERY
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1808414CEFOMActiveYesNoCOMPRESSED AIR19-JAN-2026 00:0006-MAR-2026 00:00Perez, JaseDemo of the existing CDA filter at penetration 7-14 and provide LOTO for compressed air in Sector 07 and 08 ofPerez, Jase
1811142MFDMActiveYesYesCRYO DISTRIBUTION23-MAR-2026 00:0031-MAR-2026 00:00Ki, TaekyungVTL (Vertical Transfer Line) 3 Installation Hiatt, Tommy
1808291CEFEActiveYesNoELECTRICITY12-JAN-2026 00:0012-JAN-2026 00:00Hart, JeffHE LDT - LOTO support for EED Sector 7-10 rack & cable demo Request is for F&O electricians develop an enerHart, Jeff
18084114SSEDActiveYesNoODM12-JAN-2026 00:0016-JAN-2026 00:00Nicolas, Ludovic Y.Inspect, tag and disconnect S07 ODM cables that will need to be removed and/or reused.Perez, Jase
18084116SSEDActiveYesNoODM12-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Inspect ODM racks wiring in the alcove of S01-S08 to update drawings and serve a basis for the design of HE ODPerez, Jase
1808411OTHERActiveYesYesODM02-FEB-2026 00:0027-MAR-2026 00:00Perez, JaseSector 07 AHU will get demo'd during the long downtime. Ductwork will need to get demo'd and existing circPerez, Jase
1815572SSEDActiveYesNoODM13-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install UltraFlow Duo Oxigraf in S00.Nicolas, Ludovic Y.
1815573SSEDActiveYesNoODM13-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove S02 Original OxigrafNicolas, Ludovic Y.
1815574SSEDActiveYesNoODM13-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install S02 UltraFlow Duo OxigrafNicolas, Ludovic Y.
1815575SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove S03 Original OxigrafNicolas, Ludovic Y.
1815931MFDMActiveYesYesODM19-DEC-2025 00:0005-OCT-2026 00:00Atkinson, Richard D.Open louvers in ODH ducting at S1P18, S2P18, and S4P18. Louvers will be returned to closed positions after theAtkinson, Richard D.
1804594OTHERActiveYesNoOTHER22-JAN-2026 00:0030-APR-2026 00:00Checchin, MattiaInstall SSA and waveguide frames anchors in S7 through S9. SOW steps - - drill and install anchors (contractChecchin, Mattia
1804595OTHERActiveYesNoOTHER05-JAN-2026 00:0023-JAN-2026 00:00Checchin, MattiaInstall penetration shield bases anchors in P9-05 and P7-17 - - drill and install anchors (contractor) - speChecchin, Mattia
1804596OTHERActiveYesYesOTHER02-FEB-2026 00:0030-APR-2026 00:00Checchin, MattiaInstall anchors and hangers for waveguide on S7 housing N-wall - install anchors (contractor) - special inspChecchin, Mattia
1808415CEFOMActiveYesNoOTHER02-FEB-2026 00:0027-FEB-2026 00:00Perez, JaseSubcontractor to install new He Guard for future cryomodules FWKD0114957Perez, Jase
1813752OTHERActiveYesYesOTHER28-JAN-2026 00:0030-JAN-2026 00:00Loo, AlyssonFirst set of HPRF Penetration Installations at P08-05 and P09-06. Work is part of RSWCF 10672Loo, Alysson
1813753OTHERActiveYesYesOTHER24-FEB-2026 00:0003-MAR-2026 00:00Loo, AlyssonSecond set of HPRF penetration installations - P07-06 P07-07 P07-09 P07-10 P07-11 P07-12 P07-13 P07-14Loo, Alysson
18195812CBLActiveYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelSector 10 Gallery Controls DemoHernandez, Joel
18195813CBLActiveYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelGallery Controls Demo S7-PF (Down Stream) (Penetrations 8-16)Hernandez, Joel
18195814CBLActiveYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelGallery Controls Demo S7-UHV (Up Stream) (Penetrations 1-15)Hernandez, Joel
18195815CBLActiveYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelGallery Controls Demo P08-01 to P08-05 Hernandez, Joel
18195816CBLActiveYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelTray Demo Sec 8 P4 Gallery Hernandez, Joel
18195817CBLActiveYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelRack Relocation Sec 8 P4 (Gallery) Hernandez, Joel
1804774CTLActiveYesNoRADIOS15-JAN-2026 00:00 - Bong, JamesTest tunnel radio amplifiers in S01 Alcove and gallery, S03 & S06 Gallery, and S09 Tunnel.Bong, James
1804775CTLActiveYesNoRADIOS16-JAN-2026 00:00 - Bong, JamesReplace failing 24VDC Power Supply in S06 Tunnel Radio Amplifier Chassis.Bong, James
1808711AMRFActiveYesNoRF12-JAN-2026 00:0016-JAN-2026 00:00Kelly, Richard SH2-3 still has a large mismatch between forward and reverse power after PAMM work. Replace the directional Kelly, Richard S
1812551AMRFActiveYesNoRF16-DEC-2025 00:0016-JAN-2026 00:00Kelly, Richard SCM4A, 14B, 22B, and 34B NRP pressure. Adjust all NERP pressure gauges to 2 PSI. -
18084110CEFFTActiveYesNoWATER12-JAN-2026 00:0028-FEB-2026 00:00Perez, JaseFire suppression lines in penetrations 7-06 and 7-14 will require relocation. A drain down of the system aPerez, Jase
1817221CTLCompleteYesNoATCA17-DEC-2025 00:0030-JAN-2026 00:00Vu, Minh KL2KG01-20 P23 cpu-col0-sp01 (M308-8100) is not responding to ping and there is no response on the console. InvVu, Thuy Mong
1808412CEFOECompleteYesNoELECTRICITY16-DEC-2025 00:0018-DEC-2025 00:00Perez, JaseSector 10 - MCC4P10G will require a LOTO for the tie in of a new circuit. New circuit will serve the new paPerez, Jase
1811791CTLCompleteYesNoMOVERS06-JAN-2026 00:00 - Bong, JamesRemove Aerotech Controller, LVDT Conditioner, Pigtail cables, and termination panel from rack L2KA07-05Bong, James
18084111SSEDCompleteYesNoODM05-JAN-2026 00:0009-JAN-2026 00:00Nicolas, Ludovic Y.Power down Linac ODM system S00-S07 for LDT.Perez, Jase
18084115SSEDCompleteYesNoODM12-JAN-2026 00:0016-JAN-2026 00:00Nicolas, Ludovic Y.Dismount and remove S07 oxigraf and its cabinet from Penetration 07-11.Perez, Jase
1811141OTHERCompleteYesYesOTHER17-DEC-2025 00:0018-DEC-2025 00:00Loo, AlyssonLCLS-II-HE - Removing temporary shielding blocks for VTL3 in preparation of VTL3 and permanent shielding instaHiatt, Tommy
1811151RPFOCompleteYesNoOTHER16-DEC-2025 00:0019-DEC-2025 00:00Najera, Melanie ARemove AMS and ozone devices inside AMS enclosure at 07-11 in KG (before demo starts) -
18195810CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelTray Demo Sec 9 P14 Hernandez, Joel
1819587CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelTray Demo Sec 9 P4 Hernandez, Joel
1819589CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelGallery Controls Demo S9DS (Pen Sec 9 P9-16) All Systems cables in the gallery Hernandez, Joel
1808417CEFOMCompleteYesNoWATER16-DEC-2025 00:0009-JAN-2026 00:00Harrison, William GerardWO - FWKD0115567 F&O Mechanics to drain down the 30C LCW bypass line when LCLS-SC beamline is off. Perez, Jase
1808418CEFOMCompleteYesNoWATER18-DEC-2025 00:0009-JAN-2026 00:00Harrison, William GerardWO FWKD0108977 F&O Mechanics to drain down the existing MAG LCW line when LCLS-SC beamline is off. Perez, Jase
18195811CBLDropYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelRack Relocation Sec 9 P14 Hernandez, Joel
1819588CBLDropYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelRack Relocation Sec 9 P4 Hernandez, Joel
1810611AMRFDropYesNoRF06-JAN-2026 00:0020-JAN-2026 00:00Wack, BobCM34-1 is PZt faulted after recovering machine from cryoplant trip. Replace the piezo PCB.Wack, Bob

LINAC MIDDLE GALLERY
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1803122PEMActiveYesNoKLYSTRON / MODULATOR24-JAN-2026 00:0028-FEB-2026 00:00Reagan, Jeff17-7 T/S and repair Circuit of DC HV meter and Circuit of DQ meter Chen, Xupeng
1818663CBLActiveYesNoOTHER09-JAN-2026 00:0029-MAY-2026 00:00Mortenson, Paul R.Sector 11 Penetrations 11-04 and 11-06 remove the Gas Cylinders, Regulator and any support related to it as weHugyik, John
1795961CEFOECompleteYesNoELECTRICITY07-OCT-2025 00:0009-OCT-2025 00:00Hart, JeffThe LOTO will affect LCLS II racks L2KG11-4C & 4D Inspect and repair damaged conduits in sector 11 See Ross Hart, Jeff
1817671AMRFCompleteNoNoRF06-JAN-2026 00:0023-JAN-2026 00:00Delgadillo, Eduardo D.17-5 - SLED motor not at limit in the tune mode. Check the operation with the SLED test box. Kelly, Richard S
1818513MFDVCompleteYesNoVACUUM02-FEB-2026 00:00 - Guerra, Oscar14-8 WG valve limit switch replacement. Once completed coordinate with CTL (Alverson) to ensure limit switchesDiaz, Gregory L.

SOFTWARE
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1818181SWEActiveNoNoALARMS18-NOV-2026 00:00 - Summers, TashaUnbypass the things in the task list if they're ready. Summers, Tasha