FACET-II Downtime JOBS    06-JUL-2026 06:00   to   30-SEP-2026 18:00

1 - 1

Total JobsActiveCompleteDroppedRolledDeniedRSWCFsAddedLast Update
2615416211010-JUN-2026 13:12:005




LINAC MIDDLE (S10-20)
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1840577CTLActiveNoNoBPM06-JUL-2026 00:0020-SEP-2026 00:00Murphy, James MatthewBPM Controls System CheckoutMurphy, James Matthew
1813754OTHERActiveNoYesOTHER13-JUL-2026 00:0024-JUL-2026 00:00Loo, AlyssonRemove old shielding and install new concrete shielding (drawing no. B0002-S00-0939) to penetrations - 10-5, 1Loo, Alysson
1835595CBLActiveNoNoTIMING06-JUL-2026 00:00 - Hernandez, JoelLCLS Timing Fiber Installation from Sector 2-NEH -
1818363MFDVActiveNoNoVACUUM13-JUL-2026 00:00 - Guerra, OscarLI18, WSPB5 Installation Vent the S18-20 SC Bypass line and remove the temporary drift. Transport and instAtkinson, Richard D.
1818364AEGActiveNoNoVACUUM13-JUL-2026 00:00 - Gassner, Georg L.LI18, WSBP5 alignment. Coordinate with MFDV for specific schedulingAtkinson, Richard D.
1831791CEFOMActiveNoNoWATER06-JUL-2026 00:00 - Gonzalez, Hector-Replace LCW strainers ACS, WCS and KCS -Replace Single filters ACS, WCS and KCS -Clean Heat exchangers ACS,Harrison, William Gerard
1846901CEFOIActiveNoNoWATER06-JUL-2026 00:0030-SEP-2026 00:00Regalado Baez, Eli-Supply/return temperature transmitters and RTDs. -3-way mixing valve. -Surge tank level. -Supply pressure Valdez Valenzuela, Diego
1837821RPFOCompleteYesNoOTHER20-APR-2026 00:0022-APR-2026 00:00Najera, Melanie ATroubleshoot wiring for RP ozone sensor in Sec 20 -
1700591PEMRollNoNoDC MAGNETS21-JUL-2025 00:0014-AUG-2025 00:00Herr, ChangInstall magnet PS for Compton SpectrometerStorey, Doug
1766851PEMRollNoNoKLYSTRON / MODULATOR14-APR-2025 00:0031-MAY-2026 00:00Stiles, Paul J.Sector 10 - Validate the ELP for Sector 10 focus coil PSs - SR-257-070-06-R1Chen, Xupeng
1700594CEFRRollNoNoOTHER25-AUG-2025 00:0003-SEP-2025 00:00Johnson, Scot L.Rigging support during summer downtime to lower a vacuum chamber with a magnet inside of it to the tunnel throStorey, Doug
1700596AEGRollNoNoOTHER27-AUG-2025 00:0005-SEP-2025 00:00Gassner, Georg L.Metrology support for GDC chamber installation and alignmentStorey, Doug
1723891SWERollNoNoPROF20-JUL-2026 00:00 - Dunning, MichaelAdd IOCs for new Orca cameras. Each CPU will run an IOC with a single camera (for now). cpu-li20-pm09 -> Dunning, Michael
1700595ARDTFRollNoNoVACUUM25-AUG-2025 00:0005-SEP-2025 00:00McCormick, DougInstall GDC chamber inside FACET tunnelStorey, Doug

LINAC MIDDLE GALLERY
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1831872CEFCActiveNoNoOTHER06-JUL-2026 00:0020-AUG-2026 00:00Toews, DavidSector 17. Craft shop to remove building panels. remove lead paint from metal supports to be cut by contractoHarrison, William Gerard
1831873CEFEMActiveNoNoOTHER06-JUL-2026 00:00 - Johnson, Scot L.Sector 17. Remove Old KCS Heat Exchanger and re-install new KCS Heat Exchanger. Palletize old unit to be sentHarrison, William Gerard
1839091AEGActiveYesNoOTHER04-MAY-2026 00:00 - Gassner, Georg L.map 13 penetrations in sectors 10 & 11 (p10-11, 10-14, 10-15, 10-16, 10-17, and p11-01 to 11-08), to design neGassner, Georg L.
1842413CTLActiveYesNoTIMING18-MAY-2026 00:00 - Harms, MikeS10 RF Hut - check Fiducial Generator hardware and power supplyBianchini Mattison, Carolina
1831871CEFOMActiveNoNoWATER13-JUL-2026 00:0018-SEP-2026 00:00Harrison, William GerardReplacement of Sector 17 KCS Heat Exchanger Mechanics to secure Cooling tower water, drain off Tower and LCW Harrison, William Gerard
1831874OTHERActiveNoNoWATER13-JUL-2026 00:0017-JUL-2026 00:00Harrison, William GerardSector 17. Contractors work associated with removal and installation of the heat exchanger Harrison, William Gerard
1831875CEFOEActiveNoNoWATER06-JUL-2026 00:00 - Hart, JeffSector 17. High Volts to open switch to the KCS Pump and to megger pump motor prior to start up after heat excHarrison, William Gerard
1831876RPFOActiveNoNoWATER07-JUL-2026 00:00 - Brogonia II, Henry C.Sector 17. Assist with surveys for the KCS Heat Exchanger replacement.Harrison, William Gerard
1846471CTLCompleteYesNoWIRES16-JUN-2026 00:00 - Bong, JamesVerify HV and ADC are operational.Huang, Ziyu

ACR
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1842132OTHERCompleteNoNoOTHER18-MAY-2026 00:0019-MAY-2026 00:00Griswold, RogerTesting 1 2 3 -
1842133OTHERCompleteYesNoOTHER17-MAY-2026 00:0018-MAY-2026 00:00Reagan, JeffMy computer looks too good. -

LINAC EAST
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1844792RPFODropNoNoPPS27-JUL-2026 00:0019-AUG-2026 00:00Harris, Anne M.BSOIC BSOLNM02 must also be source checked and certified under SLAC-I-040-304-011-13 when the other BSOICs on Harris, Anne M.