LCLS SC Downtime JOBS    16-DEC-2025 06:00   to   21-DEC-2026 16:00

1 - 1

Total JobsActiveCompleteDroppedRolledDeniedRSWCFsAddedLast Update
440197229122652929228-JUL-2026 20:05:16375




INJECTOR WEST
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1853271CTLActiveYesNoATCA15-JUL-2026 00:0024-JUL-2026 00:00Vu, Minh KSEC00-SEC01 - POWER RESTART ATCA hardware and Common Platform Servers including all high performing servers afVu, Thuy Mong
1851901CTLActiveYesNoLASER20-JUL-2026 00:0007-AUG-2026 00:00Vu, Thuy MongL2CID-01 cpu-lgun-ls01 (8201) - Install 10G NIC card and configuration to boot on 10G NICVu, Thuy Mong
1851902CTLActiveYesNoLASER22-JUL-2026 00:0014-AUG-2026 00:00Vu, Minh KL2CID-03 cpu-lgun-ls02 (8201) - Install 10G NIC card and configuration to boot on 10G NIC. Add addition 1G NICVu, Thuy Mong
18043816OTHERActiveNoYesOTHER16-DEC-2025 00:00 - Chin, Edward PaulRemoving S0 BCS shutters on 12/16 8AM for S0 gun repair work, and reinstall after the gun repair work is complZhou, Feng
1826522AEGActiveYesNoOTHER17-FEB-2026 00:0010-AUG-2026 00:00Gassner, Georg L.Repeatedly map position of monuments in Injector West for relative movements during LEIT tunnel construction -
1844981RPFOActiveYesNoPPS10-AUG-2026 00:00 - Harris, Anne M.Perform 6-month Source Checks and Certifications for Injection West BSOIC, BSOLNM02 for SLAC-I-040-304-011-13Harris, Anne M.
1852571RPFOActiveYesNoPPS21-JUL-2026 00:0010-SEP-2026 00:00Harris, Anne M.RPFO will perform the annual inventory and leak test of the sealed sources located inside BSOLNM02 and BSOLNM0Harris, Anne M.
1851892CTLActiveYesNoPROF13-JUL-2026 00:00 - Curtis, CourtneyYAG01B lamps do not work, need to remove chassis for repairs.Curtis, Courtney
1709074CTLActiveYesNoTEMPERATURE24-FEB-2026 00:00 - Balakrishnan, NamrataAdd new beckhoff panel with its temperature and flow signals into EPICS. Release R7.8.11 of Temperature App tKelly, Richard S
1815192CTLActiveYesNoVACUUM13-JAN-2026 00:00 - Lai, Chinh DucInstall new secondary PLC crate, power supply panel, and wire cross-connects in rack to accommodate new Gamma Karimian, Sherwin
18043815PEMCompleteYesNoDC MAGNETS05-JAN-2026 00:0030-JUN-2026 00:00Lam, Briant K.disconnect cables for bucking coil, solenoids all 5 correctors and reconnect later after the work is doneZhou, Feng
1804385CTLCompleteYesNoLASER16-DEC-2025 00:00 - Alverson, Shawn Christopherdisconnect s0 laser control cable Zhou, Feng
1815211CTLCompleteYesNoMOVERS06-JAN-2026 00:00 - Bong, JamesDisconnect, tag, and coil solenoids motion control cables in preparation for LDT workMontironi, Alex
1815212CTLCompleteYesNoMOVERS06-JAN-2026 00:00 - Bong, JamesDisconnect, tag, and coil collimator/YAG motion cables in preparation for LDT gun reworkMontironi, Alex
18043810CBLCompleteYesNoOTHER05-JAN-2026 00:00 - Boucher, Salimedisconnect cables around CM01 endcap area and organize these cables remove the vertical cable tray installZhou, Feng
18043811CTLCompleteYesNoOTHER05-JAN-2026 00:00 - Bong, Jamesremove tuners and reinstall them later Zhou, Feng
18043812AEGCompleteYesNoOTHER05-JAN-2026 00:00 - Gassner, Georg L.metrology correctors & SOL1/2 before the work starts and after the work is complete metrology M1 again after Zhou, Feng
18043813CTLCompleteYesNoOTHER05-JAN-2026 00:00 - Alverson, Shawn Christopherreconnect laser control cables Zhou, Feng
18043814CTLCompleteYesNoOTHER06-JAN-2026 00:00 - Hoobler, SonyaDisconnect cables for BPM1B and BPM2BZhou, Feng
18043818CTLCompleteYesNoOTHER06-JAN-2026 00:00 - Murphy, James MatthewDisconnect cables for toroid IM01Zhou, Feng
18043819CTLCompleteYesNoOTHER21-APR-2026 00:0022-APR-2026 00:00Hoobler, SonyaReconnect cables for BPM1B and BPM2BZhou, Feng
1804381OTHERCompleteYesNoOTHER16-DEC-2025 00:00 - Zhou, FengGun+LEB repairZhou, Feng
18043821MFDMCompleteYesNoOTHER21-JAN-2026 00:0022-JAN-2026 00:00Correa, Daniel JacobRemove CM01 endcap support structure (Correa) Open the CM01 big bellow and close the gate valve in CM01 (Coy)Zhou, Feng
18043826MFDMCompleteYesNoOTHER01-APR-2026 00:0001-APR-2026 00:00Correa, Daniel JacobRecovery for CM01 endcap structure & its accessories , reinstall CM01 endcap support structure (MFD-Correa)Zhou, Feng
1804382MFDMCompleteYesNoOTHER17-DEC-2025 00:00 - Correa, Daniel Jacobremove s0 laser table Zhou, Feng
1804383MFDMCompleteYesNoOTHER05-JAN-2026 00:00 - Correa, Daniel Jacobremove gun & buncher water hoses and blow out, and reinstall later remove the gun SS water tubing and reinstaZhou, Feng
1804384CTLCompleteNoNoOTHER17-DEC-2025 00:00 - Lai, Chinh Ducremove s0 gun u-shape waveguide relevant RTDs Zhou, Feng
1804386OTHERCompleteYesNoOTHER16-DEC-2025 00:00 - Gassner, Georg L.metrology laser table, laser Mirror M1Zhou, Feng
1804387OTHERCompleteYesNoOTHER05-JAN-2026 00:00 - Benwell, Andy Ldisconnect gun & buncher RF probes, and reinstall later Remove buncher WGs, and reinstall later Reinstall gZhou, Feng
1804388OTHERCompleteYesNoOTHER02-FEB-2026 00:0002-MAR-2026 00:00Reed, Dentell V.remove loadlock transverse arm (from central chamber flange to aisle) remove the bottom chamber of the centraZhou, Feng
1804389OTHERCompleteYesNoOTHER08-JAN-2026 00:00 - Karimian, Sherwindisconnect NEGs and Ion pumps cables and secure them, and reconnect them later replace cables for some hot fiZhou, Feng
1806341AEGCompleteYesNoOTHER19-DEC-2025 00:00 - Gassner, Georg L.Map position of parts for the LCLS-II load lockGassner, Georg L.
1807401CEFASCompleteYesNoOTHER17-DEC-2025 00:0018-DEC-2025 00:00Poitier, SebastianASG to supply and install new temperature and humidity sensors on the outside of the laser enclosure. The sensPoitier, Sebastian
1826521AEGCompleteYesNoOTHER17-FEB-2026 00:00 - Gassner, Georg L.Install monuments in Injector West area -
1852231CEFASCompleteYesNoOTHER14-JUL-2026 00:0014-JUL-2026 00:00Bloom, Daniel JS0 AHU PM; filters, belts. annual PM, full checks and function reviewBloom, Daniel J
1852232CEFASCompleteYesNoOTHER14-JUL-2026 00:0014-JUL-2026 00:00Bloom, Daniel JS0 Humidifier (connected to S0 AHU); this unit had a recent full PM, this is mostly a visual check to confirm Bloom, Daniel J
1815601CTLCompleteYesNoPROF06-JAN-2026 00:00 - Curtis, CourtneyDisconnect, remove/move YAG01b cables and camera system Camera was decided to be split off as another part neCurtis, Courtney
1815602CTLCompleteNoNoPROF22-JAN-2026 00:00 - Curtis, CourtneyRemove YAG01b camera systemCurtis, Courtney
1822301CTLCompleteNoNoPROF12-MAY-2026 00:00 - Curtis, CourtneyRe-install YAG01b cameraCurtis, Courtney
18043827MFDMCompleteYesNoRF24-APR-2026 00:0024-APR-2026 00:00Correa, Daniel JacobReinstall WG support structure (MFD - Correa)Zhou, Feng
1824791ADSOCompleteYesNoSAFETY09-FEB-2026 00:0009-FEB-2026 00:00Van Hoover, Zoe D.ADSO inspection of S0 manway alcove fall protection SRLVan Hoover, Zoe D.
18043829CTLCompleteYesNoTOROIDS21-APR-2026 00:0022-APR-2026 00:00Murphy, James Matthewreconnect cables for Toroid IM01Zhou, Feng
18043822MFDVCompleteYesNoVACUUM30-JAN-2026 00:0013-FEB-2026 00:00Reed, Dentell V.Replace gun window, NEGs/IPs, & RGAZhou, Feng
18043823MFDVCompleteYesNoVACUUM18-FEB-2026 00:0025-FEB-2026 00:00Reed, Dentell V.LEB works - 1. Replace the gate valves, VV01 and VV02 2. Replace 2x NEG pumps (Z400) 3. Add 1x NEG/Ion pumpZhou, Feng
18043824MFDVCompleteYesNoVACUUM27-FEB-2026 00:0018-MAR-2026 00:00Reed, Dentell V.Gun & LEB bake-out - 1. Bakeout preparation (VAC/Bostic/TC/Feng) 2. cool down & Remove foils and equipment (Zhou, Feng
1815191CTLCompleteYesNoVACUUM12-JAN-2026 00:00 - Karimian, SherwinReplace SAES SIP Power controllers in L2KA00-02 and L2KA00-03 (11 total) with Gamma controllers (3 total) in tKarimian, Sherwin
1823691CTLCompleteYesNoVACUUM01-JAN-2026 00:0030-JAN-2026 00:00Sanchez, DanielDisconnecting cables L2A02326 from the controller side in the gallery Rack L2KG00-15 to support ongoing sectorSanchez, Daniel
18043820MFDMCompleteYesNoWATER13-JAN-2026 00:0016-JAN-2026 00:00Correa, Daniel JacobRemove gun water hoses & blowout (MFD - Correa) Remove the shielding to protect gun windows (MFD - Correa) RZhou, Feng
18043825MFDMCompleteYesNoWATER23-MAR-2026 00:0026-MAR-2026 00:00Correa, Daniel JacobRecovery Gun + LEB - 1. reconnect SS water tubes (MFD-Correa) 2. reconnect water hoses (MFD-Correa) 3. reZhou, Feng
1852233CEFASCompleteYesNoWATER14-JUL-2026 00:0014-JUL-2026 00:00Bloom, Daniel JS0 LCW pump @ pump pad by AHU, in mechanical pad below S0. (NOT the PCW pump). Annual PM for pump/motor.Bloom, Daniel J
1852234CEFASCompleteYesNoWATER14-JUL-2026 00:0016-JUL-2026 00:00Bloom, Daniel JLCW pump (located next to S0 chiller). CID pump 1Bloom, Daniel J
1782552CTLDropNoNoPROF06-APR-2026 00:0016-JAN-2027 00:00Curtis, CourtneyReplace YAG01B Camera is getting replaced/upgraded during GUNB LDT work so closing this CATER.Curtis, Courtney
1802291CTLDropNoNoPROF09-JAN-2026 00:00 - Curtis, CourtneyRemove unused YAG01B pneumatic control cable. Cable shop is removing cable.Curtis, Courtney
18043828CTLDropYesNoVACUUM03-MAR-2026 00:00 - Karimian, SherwinRe certify Vacuum PLC GUNBZhou, Feng

LINAC WEST (S1-9)
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1821801SWEActiveYesNoARCHIVER30-SEP-2026 00:00 - Summers, TashaReminder to resume PVs by end of LDTSummers, Tasha
1782341SSEDActiveNoYesBCS19-JUN-2025 10:0021-JUL-2025 18:00Cobau, Bill GDownload new firmware to all of the LCLS II BCS LBLM chassis that will filter out the noise from the SC BEAM oCobau, Bill G
1650861CTLActiveNoNoBPM23-FEB-2026 00:0021-DEC-2026 00:00Murphy, James MatthewInvestigate BPM cables in LINAC West and Gallery Racks in S2 & S4Murphy, James Matthew
18127712CTLActiveNoNoBPM26-OCT-2026 00:0018-DEC-2026 00:00Murphy, James MatthewConnect BPM Cables at CM34 Flange D and perform Controls Checkout for CM34Coy, Robert
1839115CTLActiveYesNoBPM27-JUL-2026 00:0029-JUL-2026 00:00Murphy, James Matthewconnect BPM cales and checkout for CM34Wilson, Andrew R
1840561CTLActiveYesNoBPM29-APR-2026 00:0021-DEC-2026 00:00Murphy, James MatthewQA InstallationMurphy, James Matthew
1840562CTLActiveYesNoBPM29-APR-2026 00:0021-DEC-2026 00:00Murphy, James MatthewRemove and Install Hardware in Racks L2KG07-37 L2KG07-38 L2KG08-3A L2KG08-25 L2KG08-60 L2KG09-3C L2KG09Murphy, James Matthew
1840563CTLActiveYesNoBPM29-APR-2026 00:0021-DEC-2026 00:00Murphy, James MatthewInstall Rack Jumper CablesMurphy, James Matthew
1840564CTLActiveYesNoBPM29-APR-2026 00:0021-DEC-2026 00:00Murphy, James MatthewInstall Tunnel Jumper CablesMurphy, James Matthew
1840565CTLActiveYesNoBPM29-APR-2026 00:0021-DEC-2026 00:00Murphy, James MatthewTest (TDR) BPM Cable sets End to EndMurphy, James Matthew
1840566CTLActiveYesNoBPM29-APR-2026 00:0021-DEC-2026 00:00Murphy, James MatthewBPM Controls System CheckoutMurphy, James Matthew
1853092CTLActiveYesNoBPM26-OCT-2026 00:0018-DEC-2026 00:00Murphy, James MatthewConnect BPM Cables at CM35 Flange D and perform Controls Checkout for CM35 -
1784901CEFOIActiveYesNoCOMPRESSED AIR12-JAN-2026 00:0004-AUG-2026 00:00Regalado Baez, EliInstall clean, rigid tubing for HE cryomodule cryogenic valves from marked panel locations on south wall to noValdez Valenzuela, Diego
1780431PEMActiveNoNoDC MAGNETS24-FEB-2026 00:0030-SEP-2026 00:00Lam, Briant K.CM22 - Inspect magnet power and voltage tap wiring to troubleshoot false quench faults.Lam, Briant K.
1780432PEMActiveYesNoDC MAGNETS24-FEB-2026 00:0030-SEP-2026 00:00Lam, Briant K.CM30 - Inspect magnet power and voltage tap wiring to troubleshoot false quench faults.Lam, Briant K.
18384311PEMActiveYesNoDC MAGNETS29-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM55 and Rack L2KG09-56 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384312PEMActiveYesNoDC MAGNETS29-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM56 and Rack L2KG09-57 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384313PEMActiveYesNoDC MAGNETS29-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM57 and Rack L2KG09-58 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384314PEMActiveYesNoDC MAGNETS17-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM58 and Rack L2KG10-51 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384315PEMActiveYesNoDC MAGNETS16-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM59 and Rack L2KG10-52 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384316PEMActiveYesNoDC MAGNETS27-MAY-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM37 and Rack L2KG07-55 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384317PEMActiveYesNoDC MAGNETS27-MAY-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM38 and Rack L2KG07-56 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384318PEMActiveYesNoDC MAGNETS27-MAY-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM39 and Rack L2KG07-57 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384319PEMActiveYesNoDC MAGNETS27-MAY-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM40 and Rack L2KG07-58 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
1838431PEMActiveNoNoDC MAGNETS22-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnVerify LCLS-II-HE dc magnet power supply cables in S8/S9, already released to SLAC from the contractors.Lam, Briant K.
18384320PEMActiveYesNoDC MAGNETS27-MAY-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM41 and Rack L2KG08-51 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384321PEMActiveYesNoDC MAGNETS27-MAY-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM42 and Rack L2KG08-52 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384322PEMActiveYesNoDC MAGNETS27-MAY-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM43 and Rack L2KG08-53 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384323PEMActiveYesNoDC MAGNETS27-MAY-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM44 and Rack L2KG08-54 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
18384324PEMActiveYesNoDC MAGNETS27-MAY-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM45 and Rack L2KG08-55 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
1838432PEMActiveYesNoDC MAGNETS27-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM46 and Rack L2KG08-56 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
1838433PEMActiveYesNoDC MAGNETS27-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM47 and Rack L2KG08-57 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
1838434PEMActiveYesNoDC MAGNETS27-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM48 and Rack L2KG08-58 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
1838435PEMActiveYesNoDC MAGNETS27-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM49 and Rack L2KG08-59 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
1838436PEMActiveYesNoDC MAGNETS27-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM50 and Rack L2KG09-51 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
1838437PEMActiveYesNoDC MAGNETS27-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM51 and Rack L2KG09-52 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
1838438PEMActiveYesNoDC MAGNETS27-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM52 and Rack L2KG09-53 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
1838439PEMActiveYesNoDC MAGNETS27-APR-2026 00:0018-DEC-2026 00:00Hugyik, JohnCM53 and Rack L2KG09-54 Following LCLS-II-HE Cryomodule Magnet Power CheckoutLam, Briant K.
1616021CTLActiveNoNoDUMPS/COLLIMATORS16-MAR-2026 00:00 - Bong, Jamesinspect and remount collimator termination panel for CEHTRBalakrishnan, Namrata
1839117CTLActiveYesNoDUMPS/COLLIMATORS03-AUG-2026 00:0009-OCT-2026 00:00Wilson, Andrew RReconnect and dress cryo cables to CM35 (heaters, magnets, valves, pressures, liquid levels, fluxgates) accordWilson, Andrew R
1848053AMGActiveYesYesELECTRICITY21-JUL-2026 00:0028-AUG-2026 00:00Perez, Jase SCUIR - Excavation Sector 10 south gallery road for new 5" conduit that shall enter existing electrical vaultPerez, Jase S
1851481CEFOEActiveYesNoELECTRICITY14-JUL-2026 00:0026-AUG-2026 00:00Regalado Baez, Diego DiegoK-Subs Maintenance & Breaker Testing plus Summer Electrical Outage Support Sub 519, K-Subs - K1A/B, K1E K-2Regalado Baez, Diego Diego
1656842SWEActiveYesNoMOTION CONTROL02-OCT-2026 00:00 - Balakrishnan, NamrataAdd routine and button for homing BC1B in open loop mode. Release motion app version - R3.11.30-1.0.4 for sioBong, James
1811799CTLActiveYesNoMOVERS18-OCT-2026 00:00 - Montironi, AlexCEDOG motion control checkout when jaws are unlocked. This checkout also requires water hoses and RTD cables tBong, James
1852841CTLActiveYesNoMPS13-JUL-2026 00:0031-JUL-2026 00:00Mock, Jeremy ALCLS-II-HE MPS Cable checkoutMock, Jeremy A
1852842CTLActiveYesNoMPS13-JUL-2026 00:0028-AUG-2026 00:00Mock, Jeremy ALCLS-II-HE MPS rack workMock, Jeremy A
1852843CTLActiveYesNoMPS07-SEP-2026 00:0001-OCT-2026 00:00Mock, Jeremy ALCLS-II-HE MPS CheckoutMock, Jeremy A
18084112SSEDActiveNoNoODM28-JUL-2026 00:0018-DEC-2026 00:00Nicolas, Ludovic Y.Turn the Linac ODM System back ON on all sectors 00 to 10.Perez, Jase S
18084113SSEDActiveYesNoODM02-NOV-2026 00:0018-DEC-2026 00:00Nicolas, Ludovic Y.Linac ODM System certification (IAT).Perez, Jase S
18084119SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install new S07 UltraFlow Duo Oxigraf, its cabinet and wire it for operations at Penetration P07-10. The S07Perez, Jase S
18084120SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install new S08 UltraFlow Duo Oxigraf, its cabinet and wire it for operations at Penetration P08-09. Perez, Jase S
18084121SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install new S09 UltraFlow Duo Oxigraf, its cabinet and wire it for operations at Penetration P09-09.Perez, Jase S
18084122SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install new S10 UltraFlow Duo Oxigraf, its cabinet and wire it for operations at Penetration P10-04.Perez, Jase S
18084123SSEDActiveYesNoODM16-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install ODM system panels and wiring in L2KA08-08 rackPerez, Jase S
18084124SSEDActiveYesNoODM16-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install ODM system panels and wiring in L2KA09-14 rackPerez, Jase S
18084125SSEDActiveYesNoODM16-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install ODM system panels and wiring in L2KA10-17 rackPerez, Jase S
18084131SSEDActiveYesNoODM02-MAR-2026 00:0003-AUG-2026 00:00Nicolas, Ludovic Y.Test the new Oxigraf air lines in HE sectors (07, 08, 09 and 10) when installation is completed by F&O with a Perez, Jase S
18084133SSEDActiveYesNoODM30-MAR-2026 00:0011-DEC-2026 00:00Nicolas, Ludovic Y.The job is for adding Sector 10 to the SC Linac ODM system as part of the HE project. This means adding this SPerez, Jase S
18155710SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install S05 UltraFlow Duo OxigrafNicolas, Ludovic Y.
18155711SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove S06 Original OxigrafNicolas, Ludovic Y.
18155712SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install S06 UltraFlow Duo OxigrafNicolas, Ludovic Y.
1815571SSEDActiveYesNoODM05-JAN-2026 00:0016-DEC-2026 00:00Nicolas, Ludovic Y.Remove S00 original Oxigraf to allow for its swap with UltraFlow modelNicolas, Ludovic Y.
1815576SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install S03 UltraFlow Duo OxigrafNicolas, Ludovic Y.
1815577SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove S04 Original OxigrafNicolas, Ludovic Y.
1815578SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install S04 UltraFlow Duo OxigrafNicolas, Ludovic Y.
1815579SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove S05 Original OxigrafNicolas, Ludovic Y.
1800721CBLActiveNoNoOTHER15-JUL-2026 00:0031-AUG-2026 00:00Hernandez, JoelSector 0-10 Alcoves Change out Network rack doors, install rack fans and wire per John Hugyik.Hernandez, Joel
1802194MFDMActiveYesYesOTHER05-JAN-2026 00:0030-SEP-2026 00:00Atkinson, Richard D.Remove BRB1 dipole and CDOG collimator and relocate it downstream by S10 wall in linac-west Remove BRB2 dipWhite, Dominique A
1810381MFDMActiveYesNoOTHER02-FEB-2026 00:0030-JUN-2026 00:00Checchin, MattiaInstall ceiling waveguides in penetrations P07-09 through P10-04 (P09-09 and P09-10 excluded)Checchin, Mattia
1810382MFDMActiveYesNoOTHER01-MAR-2026 00:0030-SEP-2026 00:00Checchin, MattiaInstall vertical waveguides in penetrations P07-09 through P10-04Checchin, Mattia
1810881MFDMActiveYesNoOTHER09-MAR-2026 00:0028-AUG-2026 00:00Atkinson, Richard D.Unload Cryomodules at S10 adit and transport to final location in HousingWhite, Dominique A
1810882OTHERActiveYesNoOTHER09-MAR-2026 00:0028-AUG-2026 00:00Gassner, Georg L.Align Cryomodules once they've been placed on stands in housingWhite, Dominique A
1810883OTHERActiveYesNoOTHER09-MAR-2026 00:0028-AUG-2026 00:00Johnson, Scot L.Support Unload of Cryomodules at S10 adit during LDTWhite, Dominique A
1810884MFDMActiveYesNoOTHER09-MAR-2026 00:00 - Chase, RandallCryomodule interconnect welds and inspectionWhite, Dominique A
1810887MFDMActiveYesNoOTHER01-JUN-2026 00:00 - White, Dominique APressure test of cryo lines after interconnect welds are completeWhite, Dominique A
1810888MFDMActiveYesNoOTHER01-JUN-2026 00:00 - Atkinson, Richard D.Cryomodule interconnect close upWhite, Dominique A
1813471RPFOActiveYesNoOTHER30-NOV-2026 00:0018-DEC-2026 00:00Najera, Melanie AWalkthrough to update RP survey maps for LINAC West at end of LDT. -
1815041MFDMActiveYesNoOTHER12-JAN-2026 00:00 - Atkinson, Richard D.After demo, Install LCLS-II stands and devices in S10 West. -
1815042MFDVActiveYesNoOTHER09-FEB-2026 00:00 - Diaz, Gregory L.Install drift tubes after stands installation -
1823471MFDMActiveYesNoOTHER04-MAY-2026 00:0030-SEP-2026 00:00Atkinson, Richard D.Remove, inspect for proper fit, clean, and reinstall the following Cryomodule CD valves - CM01, CM08, CM10, CMGalindo, Alondra B
1827491MFDMActiveYesYesOTHER17-FEB-2026 00:0018-SEP-2026 00:00Atkinson, Richard D.Remove old shielding and install new concrete shielding (drawing no. B0002-S00-0939) to penetrations - 10-5, 1 -
1833971OTHERActiveYesNoOTHER24-MAR-2026 00:0031-JUL-2026 00:00Demissie, Ashenafi AlemuThis task includes Quality check on cable plant installation by cable plant contractors or cable shop between Demissie, Ashenafi Alemu
1842631CTLActiveNoNoOTHER13-MAY-2026 00:0009-OCT-2026 00:00Wilson, Andrew RTest input configuration of new cryo software by connecting test plugs to Rockwell remote I/O and test LakshorWilson, Andrew R
1842632CTLActiveNoNoOTHER13-MAY-2026 00:0009-OCT-2026 00:00Ali, Isaac MEnsure all files needed for reverting are saved (included save/restore functions). Load new EPICS code and PLCWilson, Andrew R
1842634CTLActiveNoNoOTHER18-MAY-2026 00:0009-OCT-2026 00:00Wilson, Andrew RTest and calibrate heaters per procedure. Requires disconnecting heater cables from cryomodule then connectingWilson, Andrew R
1842635CTLActiveNoNoOTHER18-MAY-2026 00:0009-OCT-2026 00:00Wilson, Andrew RTest LCLS-II cryo distribution valves per procedure (CM01-CM35 and DB1&2). System should be at ambient pressurWilson, Andrew R
1848051OTHERActiveYesYesOTHER17-JUN-2026 00:0024-JUL-2026 00:00Perez, Jase SCUIR - Subcontractor excavation at Sector 04 for new vaultPerez, Jase S
1848052AMGActiveYesYesOTHER20-JUL-2026 00:0028-AUG-2026 00:00Perez, Jase SCUIR - Excavation and road widening Sector 10 north gallery road for future K5B substationPerez, Jase S
1852235CEFASActiveYesNoOTHER15-JUL-2026 00:0015-JUL-2026 00:00Bloom, Daniel JS2 exhaust fan annual PM's - function checks, change belts, adjust/alignment, regrease, etc.Bloom, Daniel J
1852236CEFASActiveYesNoOTHER16-JUL-2026 00:0016-JUL-2026 00:00Bloom, Daniel JS03 exhaust fan annual PM's - function checks, change belts, adjust/alignment, regrease, etc. Bloom, Daniel J
1853095CTLActiveYesNoOTHER22-JUL-2026 00:0024-JUL-2026 00:00Wilson, Andrew RDisconnect any remaining cryo cables from CM35 -
1815841CBLActiveYesYesPPS18-DEC-2025 00:00 - Hernandez, JoelCut existing cable ID LHE07780 below and above penetration Sector 8 Penetration 12. Install New junction box iHernandez, Joel
1815842CBLActiveYesYesPPS17-DEC-2025 00:00 - Hernandez, JoelCut existing cable ID's LHE07781,2,3 (12PR Trunks) Install new junction box above and below Sector 9 P 4 InstaHernandez, Joel
1815844CBLActiveYesNoPPS18-DEC-2025 00:00 - Hernandez, JoelInstall New RP Radiation Monitoring cable Sector 10 P8Hernandez, Joel
1815846CBLActiveYesNoPPS06-JAN-2026 00:00 - Hernandez, JoelInstall New Copper Pipe at Sector 10 P8, S7P11, S8P12Hernandez, Joel
1840781RPFOActiveYesYesPPS11-MAY-2026 00:0015-MAY-2026 00:00Harris, Anne M.Remove neutron BSOIC BSOLNW15n at Sec 4 for calibration and will re-install afterwards. Once re-installed RPFHarris, Anne M.
1844971RPFOActiveYesNoPPS10-AUG-2026 00:00 - Harris, Anne M.Perform LINAC West 6-month Source Checks and Certifications for LINAC West BSOICs. BSOICs include - BSOLNW05 tHarris, Anne M.
1852461RPFOActiveYesNoPPS13-JUL-2026 00:0030-SEP-2026 00:00Harris, Anne M.RPFO will perform the annual inventory and leak test of the sealed sources located inside all LINAC West HPI 6Harris, Anne M.
1851891CTLActiveYesNoPROF30-NOV-2026 00:00 - Curtis, CourtneyOTRDG02 camera shows extreme signs of failure, replace.Curtis, Courtney
1852301CTLActiveYesNoPROF20-AUG-2026 00:0030-SEP-2026 00:00Vu, Minh KL2KA00-11 cpu-gunb-pm01 Profile Monitor server - 10G Network Configuration and booting up for Channel Access.Vu, Minh K
1852521CTLActiveYesNoPROF21-JUL-2026 00:0031-AUG-2026 00:00Vu, Minh KL2KA04-05 cpu-bc2b-pm01 (M428-8100) - fans 2 & 4 died. Need replace.Vu, Thuy Mong
15586297SWEActiveNoNoRF20-JUL-2026 00:00 - Hoobler, SonyaThis job deploys scheduled rack checkout support for new HE cryomodules. It also adds temporary PVs for CMHoobler, Sonya
1597552AMRFActiveNoNoRF13-JUL-2026 00:0031-DEC-2026 00:00Nguyen, Binh TDowntime- LCLS-II Gun LLRF install new RF interlock chassis for EPS. Downtime job.Benwell, Andy L
1597554AMRFActiveNoNoRF20-APR-2026 00:0011-DEC-2026 00:00Benwell, Andy LInstall parallel LLRF system for the LCLS-II gun, test during downtimeBenwell, Andy L
1702651AMRFActiveNoNoRF18-JUN-2026 00:0031-DEC-2026 00:00Benwell, Andy LDowntime- CM28 Cav 1 - Stepper motor limit switch bypass - if direction of detune is confidently known, we couBenwell, Andy L
1759244AMRFActiveNoNoRF24-APR-2026 00:0031-DEC-2026 00:00Kelly, Richard SCM33 - 8 try to detune cavity approximately 30 kHz with a box at the CM during a PAMM. This will be a 'blind'Benwell, Andy L
1770362AMRFActiveNoNoRF24-APR-2026 00:0031-DEC-2026 00:00Benwell, Andy LSome SC RF BSA quantities are not showing up in the EPICS control screens.Benwell, Andy L
1811851AMRFActiveNoNoRF28-APR-2026 00:0031-DEC-2026 00:00Kelly, Richard SCM27-3 faulted on STT. Set offline. Check with the test box. -
1813131AMRFActiveNoNoRF16-DEC-2025 00:0031-DEC-2026 00:00Kelly, Richard SCMH2 Cav2 - check SSA characterization for signs of more than enough drive and lower SSA drive max to match. -
1815251AMRFActiveNoNoRF16-DEC-2025 00:0031-DEC-2026 00:00Nguyen, Phillip P.CM 34 RFS2B and PRCB check and reseat the RFS2B and PRCB connection at K1. A poor connection here can possiblBenwell, Andy L
1852481CTLActiveYesNoRF21-JUL-2026 00:0031-AUG-2026 00:00Vu, Minh KL2KG01-03 P2 cpu-l0b-rf01 (8101) fan 3 died. Need replaced.Vu, Thuy Mong
1852501CTLActiveYesNoRF21-JUL-2026 00:0031-AUG-2026 00:00Vu, Minh KL2KG02-9B P7 cpu-l1b-rfh2 (8100) FANSPEED4 is 0. Need replace.Vu, Thuy Mong
1852641CTLActiveYesNoRF21-JUL-2026 00:0031-AUG-2026 00:00Vu, Minh KL2KG06-42 P28 cpu-l3b-rf31 (8100) Fans 6 & 8 are not spinning. Need replace.Vu, Thuy Mong
1678102CTLActiveNoNoSRF20-JUL-2026 00:0030-SEP-2026 00:00Wilson, Andrew RVerify operation as part of calibration after sensor replacement led by Rob Coy.Wilson, Andrew R
1775481CTLActiveNoNoSRF02-MAR-2026 00:0018-DEC-2026 00:00Wilson, Andrew RTroubleshoot CM29 cavity 5 heater system -Look for loose wiring on power supply and P24 -Measure voltage of Wilson, Andrew R
1775482CTLActiveNoNoSRF02-MAR-2026 00:0030-SEP-2026 00:00Wilson, Andrew RReplace CM29 cavity 5 heater power supply Coordinate with cryo control room. LOTO (cord and plug) power to CMWilson, Andrew R
1775483CTLActiveNoNoSRF02-MAR-2026 00:0018-DEC-2026 00:00Wilson, Andrew RTroubleshoot CM26 cavity 3 heater system -Look for loose wiring on power supply and P23 -Measure voltage of Wilson, Andrew R
1775484CTLActiveNoNoSRF02-MAR-2026 00:0018-DEC-2026 00:00Wilson, Andrew RReplace CM26 cavity 3 heater power supply Coordinate with cryo control room. LOTO (cord and plug) power to CMWilson, Andrew R
1775485CTLActiveNoNoSRF02-MAR-2026 00:0018-DEC-2026 00:00Wilson, Andrew RTroubleshoot CM04 cavity 7 heater system -Look for loose wiring on power supply and P24 -Measure voltage of Wilson, Andrew R
1775486CTLActiveNoNoSRF02-MAR-2026 00:0018-DEC-2026 00:00Wilson, Andrew RReplace CM04 cavity 7 heater power supply Coordinate with cryo control room. LOTO (cord and plug) power to CMWilson, Andrew R
1808051MFDMActiveYesNoSRF11-MAY-2026 00:0029-MAY-2026 00:00Atkinson, Richard D.Remove final waveguide section.Coy, Robert
1808071MFDMActiveYesNoSRF11-MAY-2026 00:0029-MAY-2026 00:00Atkinson, Richard D.Remove last section of waveguide.Coy, Robert
1808091MFDMActiveYesNoSRF11-MAY-2026 00:0029-MAY-2026 00:00Atkinson, Richard D.Remove last section of waveguide.Coy, Robert
1808101MFDMActiveYesNoSRF11-MAY-2026 00:0029-MAY-2026 00:00Atkinson, Richard D.Remove last section of waveguide.Coy, Robert
1808121MFDMActiveYesNoSRF11-MAY-2026 00:0029-MAY-2026 00:00Atkinson, Richard D.Remove last section of waveguideCoy, Robert
1812777MFDMActiveYesNoSRF27-APR-2026 00:0015-MAY-2026 00:00Atkinson, Richard D.Remove Helium Process Pipes from CM34/35 per procedure SLAC-I-007-04009-05 and SLAC-I-007-04009-01.Coy, Robert
1827111MFDMActiveYesNoSRF18-MAR-2026 00:00 - Atkinson, Richard D.* Move VBB from B026 to Sector 10 adit * Unload at sector 10 * Push VBB into tunnel and onto drilled anchorsAtkinson, Richard D.
1839111CTLActiveYesNoSRF29-JUN-2026 00:0029-JUN-2026 00:00Wilson, Andrew RReconnect and dress cryo cables to CM34 (heaters, magnets, valves, pressures, liquid levels, fluxgates) accordWilson, Andrew R
1839112CTLActiveYesNoSRF29-JUN-2026 00:0029-JUN-2026 00:00Wilson, Andrew RConnect new CM34 JT and CD valve controllers to compressed air lines per LCLSII-2.7-PP-1790, after CM34 is insWilson, Andrew R
1839113CTLActiveYesNoSRF29-JUN-2026 00:0029-JUN-2026 00:00Wilson, Andrew RCalibrate the CM34 JT and CD valves following LCLSII-2.7-PP-1912, after CM34 is installed (CATER 181277), cablWilson, Andrew R
1839116CTLActiveYesNoSRF03-AUG-2026 00:0009-OCT-2026 00:00Wilson, Andrew RConnect new CM35 JT and CD valve controllers to compressed air lines per LCLSII-2.7-PP-1790, after CM35 is insWilson, Andrew R
1839118CTLActiveYesNoSRF03-AUG-2026 00:0009-OCT-2026 00:00Wilson, Andrew RCalibrate the CM35 JT and CD valves following LCLSII-2.7-PP-1912, after CM35 is installed, cables are reconnecWilson, Andrew R
1841481MFDMActiveYesNoSRF11-MAY-2026 00:0029-MAY-2026 00:00Atkinson, Richard D.Remove last section of waveguideCoy, Robert
1853901CTLActiveYesNoSRF27-JUL-2026 00:0016-OCT-2026 00:00Wilson, Andrew RConfigure cryomodule, end cap, and distribution box cryogenic controls equipment. Load firmware, set communicaWilson, Andrew R
1853902CTLActiveYesNoSRF27-JUL-2026 00:0016-OCT-2026 00:00Wilson, Andrew RTest CM37-59, EC3, and DB3 cryogenic controls equipment per procedureWilson, Andrew R
1853903CTLActiveYesNoSRF10-AUG-2026 00:0016-OCT-2026 00:00Wilson, Andrew RCalibrate cryogenic valves per procedure DB3, CM37-59, and EC3Wilson, Andrew R
1831161CBLActiveYesNoTEMPERATURE11-MAR-2026 00:00 - Hernandez, JoelHE Temperature panel relocation in Sector 9 near Z-2739. drill new holes for support of the conduit in the tunHernandez, Joel
1851921CTLActiveYesNoTEMPERATURE06-JUL-2026 00:00 - Lai, Chinh DucCross-connections and cable dressing in S7-S10Karimian, Sherwin
1853501CBLActiveNoNoTIMING08-SEP-2026 00:0016-SEP-2026 00:00Hernandez, JoelInstallation of Fiber Timing fiber duct from Sector 2 Penetration 5 down into the tunnel then cross over to thHernandez, Joel
1785751MFDVActiveYesNoVACUUM16-DEC-2025 00:0006-JAN-2026 00:00Diaz, Gregory L.L1B, He Scav Cart L1B -0295 CDA interlock fault troubleshooting due to either sensor is not functioning properDiaz, Gregory L.
1785761MFDVActiveYesNoVACUUM16-DEC-2025 00:0006-JAN-2026 00:00Diaz, Gregory L.L3, He Scav Carts CDA interlock faults troubleshooting at 6 locations. There was an unexpected function of theDiaz, Gregory L.
1810885MFDVActiveYesNoVACUUM09-MAR-2026 00:00 - Reed, Dentell V.Leak Check of interconnects after weldWhite, Dominique A
1810886MFDVActiveYesNoVACUUM09-MAR-2026 00:0031-JUL-2026 00:00Reed, Dentell V.Particle Free interconnects of CryomodulesWhite, Dominique A
1812773MFDVActiveYesNoVACUUM27-MAR-2026 00:0010-APR-2026 00:00Reed, Dentell V.Leak check CM34 helium process pipe system using procedure LCLSII-HE-1.2-PP-1376.Coy, Robert
1812775MFDMActiveYesNoVACUUM14-APR-2026 00:0017-APR-2026 00:00Atkinson, Richard D.Open Big Bellows at CM34/35, remove MLI Blankets, and Heat ShieldsCoy, Robert
1812776MFDVActiveYesNoVACUUM15-APR-2026 00:0024-APR-2026 00:00Reed, Dentell V.Remove CM34/35 BLA per procedure LCLSII-4.5-PP-1752Coy, Robert
1815616CTLActiveYesNoVACUUM16-JUN-2026 00:0031-JUL-2026 00:00Karimian, SherwinContinuity checks for ion pump and cold cathode cables in S9Karimian, Sherwin
1815617CTLActiveYesNoVACUUM22-JUN-2026 00:0031-JUL-2026 00:00Lai, Chinh DucSector 9 alcove racks - disconnect power cords from strip for controllers and panels. Install manual valve ferKarimian, Sherwin
1815618CTLActiveYesNoVACUUM06-JUL-2026 00:0031-JUL-2026 00:00Lai, Chinh DucCross-connections and cable dressing in S7-S10Karimian, Sherwin
1830391MFDVActiveYesNoVACUUM06-APR-2026 00:00 - Bostic, Mark D.Baratron installations onto CM01, HL2, CM14, CM20 & CM29. Ref. MFD WO# 44803 Document # SLAC-I-007-04009Galindo, Alondra B
1839114CTLActiveYesNoVACUUM08-JUN-2026 00:00 - Karimian, SherwinDress and reconnect vacuum control cables to CM34Wilson, Andrew R
1853094CTLActiveYesNoVACUUM26-OCT-2026 00:00 - Karimian, SherwinReconnect coupler vacuum control cables to CM35 -
1851482CEFOMActiveNoNoWATER15-JUL-2026 00:00 - Harrison, William GerardShut down S2 Mag and 30C LCW systems W.O - FWKD0127326Regalado Baez, Diego Diego
1851483CEFOMActiveNoNoWATER16-JUL-2026 00:00 - Harrison, William GerardShut down S5 Mag and 30C LCW systems FWKD0127327Regalado Baez, Diego Diego
1813841CTLCompleteYesNoATCA16-DEC-2025 00:0009-JAN-2026 00:00Vu, Minh KL2KG03-6033 P30 shm-l2b-sp02-1/5 (M300). Reset "force close" handle on slot 2 carrier.Vu, Thuy Mong
1814431CTLCompleteYesNoATCA16-DEC-2025 00:0009-JAN-2026 00:00Vu, Minh KSEC06-SEC10 Install NIC card 10G for all 8100s that connect to ATCA - SC ONLY 1. L2KG06-6044 P4 cpu-l3b-spVu, Thuy Mong
1814731CTLCompleteYesNoATCA17-DEC-2025 00:0019-DEC-2025 00:00Urbina, Maria GSEC07-SEC10 Power down ATCAs and servers for HE work., except RF HUT in SEC10 (SC only, not FACET)Vu, Thuy Mong
1799537HWPHCompleteYesNoBLEN12-JAN-2026 00:0030-JAN-2026 00:00Kruchinin, KonstantinInstall a box to house the BLEN amplifiers and a power supply under the beamline, with lead shielding.Kruchinin, Konstantin
1744252CTLCompleteYesNoBPM04-MAY-2026 00:0006-MAY-2026 00:00Murphy, James Matthewremove AMC for repairMurphy, James Matthew
1744253CTLCompleteYesNoBPM05-MAY-2026 00:0011-DEC-2026 00:00Murphy, James Matthewinstall AMCMurphy, James Matthew
1810061CTLCompleteYesNoBPM19-MAY-2026 00:0021-MAY-2026 00:00Murphy, James Matthewreplace AMCMurphy, James Matthew
1812778CTLCompleteYesNoBPM21-APR-2026 00:0024-APR-2026 00:00Murphy, James MatthewDisconnect BPM cables from CM34 Flange D. Coil cables at cable tray.Coy, Robert
1853091CTLCompleteYesNoBPM14-JUL-2026 00:0021-JUL-2026 00:00Murphy, James MatthewDisconnect BPM Cables from CM35 Flange D. Coil Cables at cable tray. -
1825212OTHERCompleteYesNoCOMPRESSED AIR10-FEB-2026 00:0013-FEB-2026 00:00Regalado Baez, EliInstall quick disconnect fitting for airline flex tubing connection at He Scav pumpcart 1195Karimian, Sherwin
1814461PEMCompleteYesNoDC MAGNETS16-DEC-2025 00:0009-JAN-2026 00:00Herr, Chang PLOTO LCLS-II EXT and DOGLEG magnet power supplies in racks - L2KG08-51 thru 56 L2KG14-51 thru 52 Lam, Briant K.
1814462PEMCompleteYesYesDC MAGNETS17-DEC-2025 00:0009-JAN-2026 00:00Herr, Chang PAirgap LCLS-II DOGLEG magnets BRB1 and BRB2 only. These are BCS monitored, requiring a RSWCF.Lam, Briant K.
1814463PEMCompleteYesNoDC MAGNETS05-JAN-2026 00:0016-JAN-2026 00:00Herr, Chang PAirgap LCLS-II EXT magnets from QX01 to BCXDLU4. Orange vest required and procedure required. Full list - QLam, Briant K.
1814464PEMCompleteYesNoDC MAGNETS17-DEC-2025 00:0009-JAN-2026 00:00Lam, Briant K.Airgap LCLS-II DOGLEG magnets from YCDOG0 to YCBP12, excluding BRB1 and BRB2 (in job 2 with RSWCF requirementsLam, Briant K.
1814465PEMCompleteYesNoDC MAGNETS12-JAN-2026 00:0016-JAN-2026 00:00Erebia, Agapito PeteValve off and disconnect PCW to racks L2KG08-51 thru 56. Blow out residual water in rack heat exchanger.Lam, Briant K.
1843861PEMCompleteYesNoDC MAGNETS20-MAY-2026 00:0029-MAY-2026 00:00Lam, Briant K.Re-measure CM54 (F29) magnet resistanceLam, Briant K.
1853621PEMCompleteYesNoDC MAGNETS17-JUL-2026 00:0024-JUL-2026 00:00Erebia, Agapito PeteOpen breakers on LCLS-II dc magnet power supply racks and turn off controllers. List of racks - L2KG00-51 LHerr, Chang P
1819751CEFECompleteYesNoELECTRICITY12-JAN-2026 00:00 - Hart, Jeff JProvide temporary power to S10 Adit tunnel through penetration 10-8 conduit.Hart, Jeff J
1811798CTLCompleteYesNoMOTION CONTROL14-JUL-2026 00:00 - Montironi, AlexRelease a new version of motion app including LCLS-II-HE modifications for CEDOG collimator IOC - sioc-dog-mcBong, James
1811792CTLCompleteYesNoMOVERS06-JAN-2026 00:00 - Bong, JamesRemove J-panel and pigtails for CEDOG in S07 and store for reinstallation.Bong, James
1811794CTLCompleteYesNoMOVERS18-JUN-2026 00:0022-JUN-2026 00:00Bong, JamesManually move CEDOG jaws to fully closed position to support engineering design of locking blocks. Bong, James
1811797CTLCompleteYesNoMOVERS13-JUL-2026 00:00 - Montironi, AlexCEDOG motion control checkoutBong, James
1815791CBLCompleteYesNoNETWORK INFRASTRUCTURE16-DEC-2025 00:00 - Hernandez, JoelJob #HENT11 for Arjun and Charley Installation of x7 network cables and terminations from KF10-8A to Z=3106. -
1815792CBLCompleteYesNoNETWORK INFRASTRUCTURE16-DEC-2025 00:00 - Hernandez, JoelJob #HENT10 Installation of Network cables from Sector 10 Gallery rack LKG10 rack #24 to Sector 10 Adit for Do -
1815811CBLCompleteYesNoNETWORK INFRASTRUCTURE16-DEC-2025 00:00 - Hernandez, JoelInstallation of Network Cables from Sector 10 gallery and Alcove to Sector 10 Adit. These cables are being putHernandez, Joel
1747881CEFOICompleteYesNoODM12-JAN-2026 00:0006-FEB-2026 00:00Delgado, SalInstallation of 1/8" air collecting tubes for HE ODM at penetrations S08-09, S09-09 and S10-04. Tubes drop dowNicolas, Ludovic Y.
1747882CEFOICompleteNoNoODM21-JUL-2025 00:0015-SEP-2026 00:00Delgado, SalLI08 move ODM controller from 08-06 to penetration 08-09 (Ch3). This includes the Oxigraf air tubing going dowNicolas, Ludovic Y.
1747883CEFOICompleteNoNoODM20-JAN-2026 00:0001-JUN-2026 00:00Delgado, SalRemove Oxigraf air lines from Pen 07-11 and install replacement ones at Pen 07-10. W.O for CEFOI - FWKD0117Nicolas, Ludovic Y.
1805201SSEDCompleteYesNoODM05-JAN-2026 00:0001-OCT-2026 00:00Nicolas, Ludovic Y.Installation of 4x4 supports in Sector 08 and Sector 09 AORs as support for ODH blue strobes. Supports tie in Nicolas, Ludovic Y.
1805202SSEDCompleteYesNoODM05-JAN-2026 00:0031-MAR-2026 00:00Nicolas, Ludovic Y.Pull wires in fire conduits of Linac West Sectors 08, 09 and 10, install the strobes/horns and connect them.Nicolas, Ludovic Y.
1805203SSEDCompleteYesNoODM05-JAN-2026 00:0001-OCT-2026 00:00Nicolas, Ludovic Y.Installation of 4x4 steel box support for ODH blue horn/strobe at the Sector 09 PPS entrance in Klystron GalleNicolas, Ludovic Y.
1805204SSEDCompleteYesNoODM05-JAN-2026 00:0001-OCT-2026 00:00Nicolas, Ludovic Y.Installation of one 4x4 steel box support for ODH blue strobe/horn at the PPS entrance of the S10 adit (outsidNicolas, Ludovic Y.
18084118SSEDCompleteYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove unused ODM system panels inside L2KA08-05 PPS Rack (back).Perez, Jase S
18084132SSEDCompleteYesNoODM05-MAR-2026 00:0003-AUG-2026 00:00Nicolas, Ludovic Y.Hardware check out (Test) of the newly installed wiring of the ODH blue strobes/horns in HE sectors.Perez, Jase S
1815771SSEDCompleteYesYesODM09-JAN-2026 00:00 - Nicolas, Ludovic Y.Power down the Linac West ODM prior to the S7-S10 rack power outage.Cyterski, Matt D.
1757023RPFOCompleteYesNoOTHER09-FEB-2026 00:00 - Frosio, ThomasRP inspections - -Injector West entry maze -S0 to S10 klystron gallery -Inside S10 ADIT -S10 wall SC sideFrosio, Thomas
1795835AEGCompleteYesNoOTHER10-FEB-2026 00:00 - Gassner, Georg L.3D scan of S7 - S10 while it is emptyGassner, Georg L.
1802193MFDVCompleteNoNoOTHER16-DEC-2025 00:0023-JAN-2026 00:00Diaz, Gregory L.Vent beam-line from gate valve at beginning of dogleg to gate valve at beginning of S12.White, Dominique A
1802195MFDMCompleteYesYesOTHER16-DEC-2025 00:0009-JAN-2026 00:00Atkinson, Richard D.S10 wall shielding installation. Once the UHV beam-line is vented, vacuum team will remove one beam-line seWhite, Dominique A
1802197MFDVCompleteYesNoOTHER18-DEC-2025 00:0030-SEP-2026 00:00Diaz, Gregory L.Disconnect and remove UHV beam-line vacuum components of the dogleg in linac west S7 through S10 wall. FolloWhite, Dominique A
1804591OTHERCompleteYesYesOTHER22-JAN-2026 00:0013-MAR-2026 00:00White, Dominique AInstall 7 sets of Cm stands in housing between S7 and S8. SOW steps - 1. Drill and install anchors (contractChecchin, Mattia
1804592OTHERCompleteYesYesOTHER22-JAN-2026 00:0030-APR-2026 00:00White, Dominique AInstall L3-L4 transition and scavenging pump anchors in S7. SOW steps - 1. drill holes and install anchors (Checchin, Mattia
1804593OTHERCompleteYesNoOTHER19-JAN-2026 00:0030-APR-2026 00:00Checchin, MattiaDemo 4 concrete pads in the S7 housing.Checchin, Mattia
1806581CBLCompleteYesNoOTHER16-DEC-2025 00:0030-JAN-2026 00:00Hernandez, JoelStage strut and hardware in Sector 7-10, for cable shifting work as per HE drawings.Hernandez, Joel
18084129AMGCompleteYesYesOTHER02-FEB-2026 00:0020-MAR-2026 00:00Perez, Jase SProject to install new duct work, support stands, etc. for new S10 adit AHU Perez, Jase S
1808416OTHERCompleteYesNoOTHER02-FEB-2026 00:0027-FEB-2026 00:00Perez, Jase SThe existing Sector 07/08 PPS Gate will get demo'd during the long downtime.Perez, Jase S
1811161RPFOCompleteYesNoOTHER16-DEC-2025 00:0019-DEC-2025 00:00Najera, Melanie ARemove ozone sensor box from tunnel at 07-11Najera, Melanie A
1811171RPFOCompleteYesYesOTHER16-DEC-2025 00:0019-DEC-2025 00:00Harris, Anne M.Remove RDM at Sec 7 (before SEC 7-10 demo) with it's pre-amp from the housing at Sec 7-11, and remove the dispHarris, Anne M.
1812421RPFOCompleteYesNoOTHER16-DEC-2025 00:0019-DEC-2025 00:00Harris, Anne M.Fiber optic cables (in bags with thermometer) for radiation hardness testing at SEC 1, across fromPC0 shieldinHarris, Anne M.
1813751MFDMCompleteYesYesOTHER09-JAN-2026 00:0017-JAN-2026 00:00Atkinson, Richard D.Remove shield caps from penetrations listed below and coordinate with riggers to move the caps to B15 parking Loo, Alysson D
1814321OTHERCompleteYesNoOTHER16-DEC-2025 00:0016-DEC-2025 00:00Griffie, Larry JAD118P on 12/16 @ 1pmGriffie, Larry J
1814322OTHERCompleteYesNoOTHER17-DEC-2025 00:0017-DEC-2025 00:00Griffie, Larry JAD118P on 12/17 @ 9amGriffie, Larry J
18195818CBLCompleteYesNoOTHER20-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelCable Demo P08-06 to P08-17 Hernandez, Joel
18195819CBLCompleteYesNoOTHER20-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelCable Demo S9US (Penetrations 1-8) Hernandez, Joel
1819581CBLCompleteYesNoOTHER13-JAN-2026 00:0023-JAN-2026 00:00Hernandez, JoelGallery Controls Demo P08-06 to P08-17. All cables Hernandez, Joel
18195820CBLCompleteYesNoOTHER20-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelCable Demo S9DS Penetrations 9-16 Hernandez, Joel
18195821CBLCompleteYesNoOTHER20-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelCable Demo S10 (tunnel) Hernandez, Joel
18195822CBLCompleteYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelCable Demo S7-PF Tunnel Hernandez, Joel
18195823CBLCompleteYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelCable Demo S7-UHV (Tunnel Demo) Hernandez, Joel
18195824CBLCompleteYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelCable Demo P08-01 to P08-5 (Tunnel) Hernandez, Joel
18195825CBLCompleteYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelShift Cable Tray P08-06 to P08-17 Hernandez, Joel
18195826CBLCompleteYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelShift Cable Tray S9 Up Stream Hernandez, Joel
18195827CBLCompleteYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelShift Cable Tray S9 Down Stream Hernandez, Joel
18195828CBLCompleteYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelShift Cable Tray S10 Tunnel Hernandez, Joel
18195829CBLCompleteYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelShift Cable Tray S7-PF S7P8-7P10 Hernandez, Joel
1819582CBLCompleteYesNoOTHER14-JAN-2026 00:0023-JAN-2026 00:00Hernandez, JoelTray Demo Sec 8 P6 Hernandez, Joel
18195830CBLCompleteYesNoOTHER20-JAN-2026 00:0027-FEB-2026 00:00Hernandez, JoelShift Cable Tray S7-UHV S7P9-S8-1 Hernandez, Joel
18195831CBLCompleteYesNoOTHER29-JAN-2026 00:0027-FEB-2026 00:00Hernandez, JoelShift Cable Tray P08-01 to P08-05 Hernandez, Joel
18195832CBLCompleteYesNoOTHER01-FEB-2026 00:0027-FEB-2026 00:00Hernandez, JoelShift Cable Tray @ PPS Gate between Sector 7-8 tunnel. Contractors need to remove wall before this work can beHernandez, Joel
1819583CBLCompleteYesNoOTHER13-JAN-2026 00:0023-JAN-2026 00:00Hernandez, JoelRack Relocation Sec 8 P6, racks will go back to B15 to be reconfigured Hernandez, Joel
1819584CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelTray Demo Sec 8 P12 Hernandez, Joel
1819585CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelRack Relocation Sec 8 P12 Hernandez, Joel
1819586CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelGallery Controls Demo S9US (Pen Sec 9 P1-8) All system cables from gallery racks and alcoves to penetrationsHernandez, Joel
1823131RPFOCompleteYesNoOTHER24-MAR-2026 00:0026-MAR-2026 00:00Najera, Melanie AReplace RP ozone sensor in Sector 2Najera, Melanie A
1824861AEGCompleteNoNoOTHER05-FEB-2026 00:0005-FEB-2026 00:00Gassner, Georg L.Layout the location of the new PPS gate at S7Gassner, Georg L.
1829711CBLCompleteYesNoOTHER01-MAR-2026 00:00 - Hernandez, JoelSec 8 P10-11 Dress and tie up cables out of the way for waveguides to be installed on the celling Hernandez, Joel
1829712CBLCompleteYesNoOTHER01-MAR-2026 00:0031-MAR-2026 00:00Hernandez, JoelSec 8- Sec 10 P4 Dress and tie up cables out of the way for waveguides to be installed on the celling Hernandez, Joel
1829713CBLCompleteYesNoOTHER09-MAR-2026 00:0027-MAR-2026 00:00Hernandez, JoelSec 8 P6 - Sec 9 P2 Tie up cables out of the way of waveguide Installation Hernandez, Joel
1829714CBLCompleteYesNoOTHER09-MAR-2026 00:0027-MAR-2026 00:00Hernandez, JoelInstallation of missing cables LHE01225 and LHE01243. as well as cables from Ash and Andrews listHernandez, Joel
1842633CTLCompleteNoNoOTHER12-MAY-2026 00:0030-JUN-2026 00:00Wilson, Andrew RUnplug all heaters from AC power for LCLS-II cryo distribution (CM01-CM35 cavity heaters (x2 cables), liquid lWilson, Andrew R
1784642SSEDCompleteYesNoPPS17-DEC-2025 00:0015-DEC-2026 00:00Nicolas, Ludovic Y. Install green light at S10 Adit entrance. PPS (outside)Nicolas, Ludovic Y.
1802196MFDMCompleteYesYesPPS17-DEC-2025 00:0007-JAN-2026 00:00Diaz, Gregory L.Sec 10 adit concrete double doors - remove the floor threshold shielding shims. This is needed to remove the fWhite, Dominique A
1811181RPFOCompleteYesYesPPS07-JAN-2026 00:0009-JAN-2026 00:00Harris, Anne M.Remove neutron and photon BSOICS (BSOLNW10 and BSOLNW11n) located in Sec 7 (prior to Sec 7- Sec10 demo).Harris, Anne M.
1815843CBLCompleteYesNoPPS16-DEC-2025 00:00 - Hernandez, JoelRemove Copper Pipe at penetration's Sec 7P11 & Sec 8 P12Hernandez, Joel
1815845CBLCompleteYesNoPPS17-DEC-2025 00:00 - Hernandez, JoelRemove & Save RP Cable at Sector 7 P12 Near RDM (Grey, Do Not cut)Hernandez, Joel
1829751RPFOCompleteNoNoPPS04-MAR-2026 00:0011-MAR-2026 00:00Harris, Anne M.Perform 6-month Source Check for photon/neutron BSOICs in LINAC West (not certification). This includes BSOICsHarris, Anne M.
1800003CTLCompleteYesNoPROF24-MAR-2026 00:00 - Curtis, CourtneyPushing the changes needed for HE for OTRDOG to ProfileMonitorAD and AlarmConfigs-profCurtis, Courtney
1800005CTLCompleteYesNoPROF05-MAY-2026 00:00 - Curtis, CourtneyWalk through S8 to double check if air panel was removed for S10 moveCurtis, Courtney
18120510CTLCompleteYesNoPROF05-JAN-2026 00:00 - Mock, Jeremy ADisconnect MPS cables in support of S7-10 HE Demo WorkSaraf, Shweta
1812051CTLCompleteYesNoPROF16-DEC-2025 00:00 - Curtis, CourtneyDisconnect Profile Monitor cables in LCLS-II DOGLEG area support HE Demo for S7-10Saraf, Shweta
1812052CTLCompleteYesNoPROF17-DEC-2025 00:0019-DEC-2025 00:00Murphy, James MatthewDisconnect BPM cables in LCLS-II DOGLEG area in support of S7-10 HE Demo WorkSaraf, Shweta
1812053CTLCompleteYesNoPROF05-JAN-2026 00:00 - Sanchez, DanielDisconnect Vacuum cables in S7-10 in support of S7-10 HE Demo WorkSaraf, Shweta
1812054CTLCompleteYesNoPROF05-JAN-2026 00:00 - Bong, JamesDisconnect Collimator (CEDOG) and fast wire scanner (WSBP1) long haul cables in LCLS-II DOGLEG in support of SSaraf, Shweta
1812055CTLCompleteYesNoPROF07-JAN-2026 00:00 - Lam, Briant K.Disconnect Magnets cables in LCLS-II DOGLEG in support of S7-10 HE Demo WorkSaraf, Shweta
1812056CTLCompleteYesNoPROF05-JAN-2026 00:00 - Karimian, SherwinDisconnect Temperature cables in S7-10 in support of S7-10 HE Demo WorkSaraf, Shweta
1812057CTLCompleteYesNoPROF05-JAN-2026 00:00 - Sanchez, DanielDisconnect Timing cables in LCLS-II DOGLEG in support of S7-10 HE Demo WorkSaraf, Shweta
1812058CTLCompleteYesNoPROF05-JAN-2026 00:00 - Shetty, ArjunDisconnect Network cables in support of S7-10 HE Demo WorkSaraf, Shweta
1812059CTLCompleteYesNoPROF18-DEC-2025 00:00 - Taylor, Zack MDisconnect and mark the following cables in the LLRF racks in support of S7-10 HE Demo Work. CM31-CAVITY 1-4 Saraf, Shweta
1815081CTLCompleteNoNoPROF01-JUL-2026 00:00 - Curtis, CourtneyTS&R OTRDG02 Target LampCurtis, Courtney
1815091CTLCompleteNoNoPROF10-JUL-2026 00:00 - Curtis, CourtneyTS&R Voltage issue with YAGH2 to filters. Suspect issue with control cable when connected to optics box. ReCurtis, Courtney
1815851CBLCompleteYesNoRADIOS17-DEC-2025 00:0027-FEB-2026 00:00Hernandez, JoelRelocate Antenna Amplifier from Gallery to Tunnel in Sector 9 P12 Install New cables to existing long hauls, m -
1795911AMRFCompleteYesNoRF08-JAN-2026 00:0028-JAN-2026 00:00Nguyen, Phillip P.CM09 Cavity 8, monitor stepper and coupler temperatures. Check for any poor connections leading to temperatur -
1814941AMRFCompleteYesNoRF07-JAN-2026 00:0014-JAN-2026 00:00Nguyen, Phillip P.CM09-8 stepper temperature out of tolerance and offline. Check with the test box. This station has a hist -
1812771MFDVCompleteYesNoSRF09-FEB-2026 00:0014-FEB-2026 00:00Coy, RobertRemove BLA from CM33-34 interconnectCoy, Robert
1812772MFDMCompleteYesNoSRF23-FEB-2026 00:0013-MAR-2026 00:00Atkinson, Richard D.Remove process pipes and conduct leak testing.Coy, Robert
1812774CTLCompleteYesNoSRF25-MAR-2026 00:0026-MAR-2026 00:00Wilson, Andrew RDisconnect cryo control RTD, fluxgate, and liquid level cables from CM33 and CM34 to install shorting plugs peCoy, Robert
1812779CTLCompleteNoNoSRF29-APR-2026 00:0001-MAY-2026 00:00Wilson, Andrew RUnplug all equipment in CM34 cryo controls rack from 120VAC. Disconnect cables from valve controller in CM33. Coy, Robert
1825031MFDMCompleteYesNoSRF26-MAR-2026 00:0027-MAR-2026 00:00Atkinson, Richard D.Bringing the box from B026, unloading at Sector 10 adit and Rolling the box into the tunnelAtkinson, Richard Edward
1825032OTHERCompleteYesNoSRF24-MAR-2026 00:00 - Rama, BirenDrill and anchor componentAtkinson, Richard Edward
1825033MFDMCompleteYesNoSRF16-FEB-2026 00:0031-MAR-2026 00:00Atkinson, Richard D.* Push FC7 off pallet and onto footing supports * Perform FC7 final alignment * Install inclined supports anAtkinson, Richard Edward
1853921CTLCompleteYesNoSRF22-JUL-2026 00:0031-JUL-2026 00:00Wilson, Andrew RConduct cryomodule controls checkout procedure LCLSII-HE-1.2-PP-0373 on F1.3-06 in S10 adit.Wilson, Andrew R
14482691CTLCompleteNoNoVACUUM16-DEC-2025 00:00 - Karimian, SherwinReplace TCP 350 Turbo Controller in L2KA03-0130 due to Error 993Karimian, Sherwin
1802191MFDVCompleteYesNoVACUUM05-JAN-2026 00:0031-JAN-2026 00:00Diaz, Gregory L.Removal of Particle free beamline (L3 Extension) from housing during LDT. Only valve extension will remain in White, Dominique A
1802192MFDMCompleteYesNoVACUUM05-JAN-2026 00:0031-JAN-2026 00:00Atkinson, Richard D.Support removal of L3 Extension during LDT.White, Dominique A
1814601CTLCompleteYesNoVACUUM16-DEC-2025 00:00 - Karimian, SherwinZero out Pirani channels on gauge controllers to resolve readback issueKarimian, Sherwin
1815611CBLCompleteYesNoVACUUM16-DEC-2025 00:00 - Hernandez, JoelInstall temporary CAT6 cable from South wall, at Z location near Pen 7-06, to North wall near L3 endcap deviceKarimian, Sherwin
1815612CTLCompleteYesNoVACUUM16-DEC-2025 00:00 - Karimian, SherwinTemporary setup of DIGI, ion pump controller, and gauge controller in housing to support local monitoring of LKarimian, Sherwin
1815613CTLCompleteYesNoVACUUM16-DEC-2025 00:00 - Karimian, SherwinLock close the following PF vacuum valves to support CM warm-up and LDT work - VVPG -GUNB -941 VVPG -HTR -Karimian, Sherwin
1815614CTLCompleteNoNoVACUUM16-APR-2026 00:00 - Karimian, SherwinDisconnect vacuum coupler control cables to support CM34 removal - ion pump and gauge pair (4 cables)Karimian, Sherwin
1815615CTLCompleteYesNoVACUUM22-APR-2026 00:0030-APR-2026 00:00Karimian, SherwinTemporary setup of DIGI, ion pump controller, and gauge controller in housing to support local monitoring of VKarimian, Sherwin
1825211CTLCompleteYesNoVACUUM06-FEB-2026 00:0013-FEB-2026 00:00Karimian, SherwinConnect existing vacuum control cables for Pumpcart 1195 in Sector 3Karimian, Sherwin
1853093CTLCompleteYesNoVACUUM15-JUL-2026 00:00 - Karimian, SherwinDisconnect coupler vacuum control cables from CM35 -
18084117CEFOMCompleteYesNoWATER20-JAN-2026 00:0020-FEB-2026 00:00Harrison, William GerardFacilities to support the demo of MAG LCW in the following areas - 1. Sector 07 of the tunnel/housing 2. SecPerez, Jase S
18084130CEFFTCompleteYesNoWATER09-FEB-0026 00:0013-MAR-0026 00:00Perez, Jase SRequesting fire tech support to drain the fire suppression line at penetrations 7-6 and 7-14 that will impact Perez, Jase S
1823101CEFOMCompleteYesNoWATER02-FEB-2026 00:0001-APR-2026 00:00Cardenas, FernandoDemolition / Removal of the now-disconnected and abandoned piping and associated supports in S9. Piping is Marshall, Dave M
1823102CEFOMCompleteYesNoWATER02-FEB-2026 00:0001-APR-2026 00:00Cardenas, FernandoThe sector 5 mechanical alcove supplies Mag LCW water both east and west of the alcove. Now that LPI has modiMarshall, Dave M
1823103CEFOMCompleteYesNoWATER01-MAY-2026 00:0008-MAY-2026 00:00Cardenas, FernandoDemolition / Removal of the now-disconnected and abandoned piping and associated supports in S5 to S7. The Marshall, Dave M
1849391CEFASCompleteYesNoWATER14-JUL-2026 00:0014-JUL-2026 00:00Bloom, Daniel JSLAC Contractor will perform Trane Chiller Preventive Maintenance 1. Service all chiller electrical componentsBloom, Daniel J
1814732CTLDropYesNoATCA08-JAN-2026 00:0009-JAN-2026 00:00Tang, Van KhanhSEC07-SEC10 Power restart ATCAs and servers after HE work, except RF HUT in SEC10 (SC only, not FACET)Vu, Thuy Mong
1810911MEDropYesNoDC MAGNETS16-DEC-2025 00:0017-DEC-2025 00:00Anderson, Mr. Scott D.Measure the water flow for DOG magnets that are not planned to go to the magnetic measurements shop during theAnderson, Mr. Scott D.
1822231ADSODropNoYesOTHER22-JAN-2026 00:0023-JAN-2026 00:00Andrews, AnthonyUnlock ADSO lock at shed above the S10 Adit. Access is needed for contractors.Andrews, Anthony
1800001CTLDropNoNoPROF16-DEC-2025 00:0030-JAN-2026 00:00Curtis, CourtneyTest OTRDOG status, then disconnect cables from device and in rack for device and rack move for HE---Dropped fCurtis, Courtney
1800002CTLDropNoNoPROF05-OCT-2026 00:00 - Curtis, CourtneyReconnect and test OTRDOG in new location Dropping for new cater 185072Curtis, Courtney
1815082CTLDropNoNoPROF07-DEC-2026 00:00 - Curtis, CourtneyReplace OTRDG02 camera Dropping for new CATERCurtis, Courtney
1814432CTLRollYesNoATCA19-JAN-2026 00:0027-FEB-2026 00:00Vu, Minh KSEC00-SEC05 Install NIC card 10G for all 8100s that connect to ATCA - SC ONLY 1. L2KA00-0542 Alcove cpu-guVu, Thuy Mong

LINAC WEST GALLERY
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1808291CEFEActiveYesNoELECTRICITY12-JAN-2026 00:0012-JAN-2026 00:00Hart, Jeff JHE LDT - LOTO support for EED Sector 7-10 rack & cable demo Request is for F&O electricians develop an enerHart, Jeff J
1829781CEFEActiveYesNoELECTRICITY07-MAR-2026 00:00 - Hart, Jeff JTie-in new conductors for the S4 I&C alcove exhaust fan. Gallery DP panel will need to be LOTOd. Gallery lightHart, Jeff J
1849671CTLActiveYesNoMOVERS03-AUG-2026 00:00 - Bong, JamesRetrieve MAC address and firmware revisions for Aerotech controllers in the field and enter into DEPOT databasBong, James
18084116SSEDActiveYesNoODM12-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Inspect ODM racks wiring in the alcove of S01-S08 to update drawings and serve a basis for the design of HE ODPerez, Jase S
1815572SSEDActiveYesNoODM13-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install UltraFlow Duo Oxigraf in S00.Nicolas, Ludovic Y.
1815573SSEDActiveYesNoODM13-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove S02 Original OxigrafNicolas, Ludovic Y.
1815574SSEDActiveYesNoODM13-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Install S02 UltraFlow Duo OxigrafNicolas, Ludovic Y.
1815575SSEDActiveYesNoODM15-JAN-2026 00:0015-DEC-2026 00:00Nicolas, Ludovic Y.Remove S03 Original OxigrafNicolas, Ludovic Y.
1815931MFDMActiveYesYesODM19-DEC-2025 00:0005-OCT-2026 00:00Atkinson, Richard D.Open louvers in ODH ducting at S1P18, S2P18, and S4P18. Louvers will be returned to closed positions after theAtkinson, Richard D.
1813753OTHERActiveYesYesOTHER24-FEB-2026 00:0031-JUL-2026 00:00Loo, Alysson DSecond set of HPRF penetration installations - P07-06 P07-07 P07-09 P07-10 P07-11 P07-12 P07-13 P07-14Loo, Alysson D
1813754OTHERActiveYesYesOTHER13-JUL-2026 00:0014-AUG-2026 00:00Loo, Alysson DRemove old shielding and install new concrete shielding (drawing no. B0002-S00-0939) to penetrations west of tLoo, Alysson D
18271916CBLActiveYesNoOTHER20-MAR-2026 00:00 - Hernandez, JoelSector 9 P9 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271917CBLActiveYesNoOTHER20-MAR-2026 00:00 - Hernandez, JoelSector 9 P10 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271919CBLActiveYesNoOTHER27-MAR-2026 00:00 - Hernandez, JoelSector 9 P12 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271920CBLActiveYesNoOTHER27-MAR-2026 00:00 - Hernandez, JoelSector 9 P13 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271921CBLActiveYesNoOTHER27-MAR-2026 00:00 - Hernandez, JoelSector 9 P14 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271922CBLActiveYesNoOTHER27-MAR-2026 00:00 - Hernandez, JoelSector 9 P15 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271923CBLActiveYesNoOTHER27-MAR-2026 00:00 - Hernandez, JoelSector 9 P16-17 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271924CBLActiveYesNoOTHER27-MAR-2026 00:00 - Hernandez, JoelSector 10 P1 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271925CBLActiveYesNoOTHER27-MAR-2026 00:00 - Hernandez, JoelSector 10 P2 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271926CBLActiveYesNoOTHER27-MAR-2026 00:00 - Hernandez, JoelSector 10 P3 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271927CBLActiveYesNoOTHER27-MAR-2026 00:00 - Hernandez, JoelSector 10 P4 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1807442AMRFActiveNoNoRF20-NOV-2025 00:0031-DEC-2026 00:00Taylor, Zack MCM25-6 SSA putting out less than 1kW max Replace RFS1BNguyen, Binh T
1808711AMRFActiveNoNoRF24-APR-2026 00:0031-DEC-2026 00:00Kelly, Richard SH2-3 still has a large mismatch between forward and reverse power after PAMM work. Replace the directional Kelly, Richard S
1817221CTLCompleteYesNoATCA17-DEC-2025 00:0030-JAN-2026 00:00Vu, Minh KL2KG01-20 P23 cpu-col0-sp01 (M308-8100) is not responding to ping and there is no response on the console. InvVu, Thuy Mong
1808414CEFOMCompleteYesNoCOMPRESSED AIR19-JAN-2026 00:0006-MAR-2026 00:00Perez, Jase SDemo of the existing CDA filter at penetration 7-14 and provide LOTO for compressed air in Sector 07 and 08 ofPerez, Jase S
1811142MFDMCompleteYesNoCRYO DISTRIBUTION31-MAR-2026 00:0001-APR-2026 00:00Ki, TaekyungVTL (Vertical Transfer Line) 3 Installation - by Subcontractor Hiatt, Tommy D.
1808412CEFOECompleteYesNoELECTRICITY16-DEC-2025 00:0018-DEC-2025 00:00Perez, Jase SSector 10 - MCC4P10G will require a LOTO for the tie in of a new circuit. New circuit will serve the new paPerez, Jase S
1811791CTLCompleteYesNoMOVERS06-JAN-2026 00:00 - Bong, JamesRemove Aerotech Controller, LVDT Conditioner, Pigtail cables, and termination panel from rack L2KA07-05Bong, James
18084111SSEDCompleteYesNoODM05-JAN-2026 00:0009-JAN-2026 00:00Nicolas, Ludovic Y.Power down Linac ODM system S00-S07 for LDT.Perez, Jase S
18084114SSEDCompleteYesNoODM12-JAN-2026 00:0016-JAN-2026 00:00Nicolas, Ludovic Y.Inspect, tag and disconnect S07 ODM cables that will need to be removed and/or reused.Perez, Jase S
18084115SSEDCompleteYesNoODM12-JAN-2026 00:0016-JAN-2026 00:00Nicolas, Ludovic Y.Dismount and remove S07 oxigraf and its cabinet from Penetration 07-11.Perez, Jase S
1808411OTHERCompleteYesYesODM02-FEB-2026 00:0027-MAR-2026 00:00Perez, Jase SSector 07 AHU will get demo'd during the long downtime. Ductwork will need to get demo'd and existing circPerez, Jase S
1804595OTHERCompleteYesNoOTHER05-JAN-2026 00:0023-JAN-2026 00:00Checchin, MattiaInstall penetration shield bases anchors in P9-05 and P7-17 - - drill and install anchors (contractor) - speChecchin, Mattia
1804596OTHERCompleteYesYesOTHER02-FEB-2026 00:0030-APR-2026 00:00Checchin, MattiaInstall anchors and hangers for waveguide on S7 housing N-wall - install anchors (contractor) - special inspChecchin, Mattia
1808415CEFOMCompleteYesNoOTHER02-FEB-2026 00:0027-FEB-2026 00:00Perez, Jase SSubcontractor to install new He Guard for future cryomodules FWKD0114957Perez, Jase S
1811141OTHERCompleteYesYesOTHER17-DEC-2025 00:0018-DEC-2025 00:00Loo, Alysson DLCLS-II-HE - Removing temporary shielding blocks for VTL3 in preparation of VTL3 and permanent shielding instaHiatt, Tommy D.
1811151RPFOCompleteYesNoOTHER16-DEC-2025 00:0019-DEC-2025 00:00Najera, Melanie ARemove AMS and ozone devices inside AMS enclosure at 07-11 in KG (before demo starts) -
1813752OTHERCompleteYesYesOTHER28-JAN-2026 00:0030-JAN-2026 00:00Loo, Alysson DFirst set of HPRF Penetration Installations at P08-05 and P09-06. Work is part of RSWCF 10672Loo, Alysson D
18195810CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelTray Demo Sec 9 P14 Hernandez, Joel
18195812CBLCompleteYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelSector 10 Gallery Controls DemoHernandez, Joel
18195813CBLCompleteYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelGallery Controls Demo S7-PF (Down Stream) (Penetrations 8-16)Hernandez, Joel
18195814CBLCompleteYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelGallery Controls Demo S7-UHV (Up Stream) (Penetrations 1-15)Hernandez, Joel
18195815CBLCompleteYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelGallery Controls Demo P08-01 to P08-05 Hernandez, Joel
18195816CBLCompleteYesNoOTHER20-JAN-2026 00:0013-FEB-2026 00:00Hernandez, JoelTray Demo Sec 8 P4 Gallery Hernandez, Joel
18195817CBLCompleteYesNoOTHER20-JAN-2026 00:0020-FEB-2026 00:00Hernandez, JoelRack Relocation Sec 8 P4 (Gallery) Hernandez, Joel
1819587CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelTray Demo Sec 9 P4 Hernandez, Joel
1819589CBLCompleteYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelGallery Controls Demo S9DS (Pen Sec 9 P9-16) All Systems cables in the gallery Hernandez, Joel
18271910CBLCompleteYesNoOTHER20-MAR-2026 00:00 - Hernandez, JoelSector 9 P3 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271911CBLCompleteYesNoOTHER20-MAR-2026 00:00 - Hernandez, JoelSector 9 P4 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271912CBLCompleteYesNoOTHER20-MAR-2026 00:00 - Hernandez, JoelSector 9 P5 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271913CBLCompleteYesNoOTHER20-MAR-2026 00:00 - Hernandez, JoelSector 9 P6 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271914CBLCompleteYesNoOTHER20-MAR-2026 00:00 - Hernandez, JoelSector 9 P7 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271915CBLCompleteYesNoOTHER20-MAR-2026 00:00 - Hernandez, JoelSector 9 P8 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
18271918CBLCompleteYesNoOTHER27-MAR-2026 00:00 - Hernandez, JoelSector 9 P11 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1827191CBLCompleteYesNoOTHER23-FEB-2026 00:0027-FEB-2026 00:00Hernandez, JoelSector 8 P10 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1827192CBLCompleteYesNoOTHER23-FEB-2026 00:00 - Hernandez, JoelSector 8 P11 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1827193CBLCompleteYesNoOTHER23-FEB-2026 00:00 - Hernandez, JoelSector 8 P12 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1827194CBLCompleteYesNoOTHER27-FEB-2026 00:00 - Hernandez, JoelSector 8 P13 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1827195CBLCompleteYesNoOTHER27-FEB-2026 00:00 - Hernandez, JoelSector 8 P14 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1827196CBLCompleteYesNoOTHER27-FEB-2026 00:00 - Hernandez, JoelSector 8 P15 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1827197CBLCompleteYesNoOTHER27-FEB-2026 00:00 - Hernandez, JoelSector 8 P16-17 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1827198CBLCompleteYesNoOTHER20-MAR-2026 00:00 - Hernandez, JoelSector 9 P1 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1827199CBLCompleteYesNoOTHER20-MAR-2026 00:00 - Hernandez, JoelSector 9 P2 Cable Terminations for HE Project at racks in Klystron Gallery Hernandez, Joel
1828951CBLCompleteYesNoOTHER26-FEB-2026 00:00 - Hernandez, JoelInstall HE Cables in Sector 10 P8 Gallery to Alcove and Gallery racks Hernandez, Joel
1828961CBLCompleteNoNoOTHER24-MAR-2026 00:0029-MAY-2026 00:00Hernandez, JoelHE Antenna Cable Installation Sector 7-10 Tunnel North wall Hernandez, Joel
1830971RPFOCompleteYesNoOTHER06-APR-2026 00:0008-APR-2026 00:00Najera, Melanie ASource check RP AMS in gallery located at Sec 2 Pen 5Najera, Melanie A
1827161CBLCompleteNoNoPPS18-FEB-2026 00:0029-MAY-2026 00:00Hernandez, JoelPPS Cables to be run from Sector 7 Gallery to Alcove 7,8 & 9. Hernandez, Joel
1827162CBLCompleteYesNoPPS18-FEB-2026 00:0030-APR-2026 00:00Hernandez, JoelPPS Cables to be run from Sector 8 Gallery to Alcove 8 & 9 & Tunnel Z=3117 & 2641 Hernandez, Joel
1827163CBLCompleteYesNoPPS18-FEB-2026 00:0030-APR-2026 00:00Hernandez, JoelPPS Cables to be run from Sector 9 Gallery to Alcove 8 & 9. Hernandez, Joel
1827164CBLCompleteYesNoPPS18-FEB-2026 00:0030-APR-2026 00:00Hernandez, JoelPPS Cables to be run from Sector 10 Gallery to Alcove 8 & 9 including Sector 10 Adit. Hernandez, Joel
1804774CTLCompleteYesNoRADIOS15-JAN-2026 00:00 - Bong, JamesTest tunnel radio amplifiers in S01 Alcove and gallery, S03 & S06 Gallery, and S09 Tunnel.Bong, James
1804775CTLCompleteYesNoRADIOS16-JAN-2026 00:00 - Bong, JamesReplace failing 24VDC Power Supply in S06 Tunnel Radio Amplifier Chassis.Bong, James
1812551AMRFCompleteYesNoRF16-DEC-2025 00:0016-JAN-2026 00:00Kelly, Richard SCM4A, 14B, 22B, and 34B NRP pressure. Adjust all NERP pressure gauges to 2 PSI. -
18084110CEFFTCompleteYesNoWATER12-JAN-2026 00:0028-FEB-2026 00:00Perez, Jase SFire suppression lines in penetrations 7-06 and 7-14 will require relocation. A drain down of the system aPerez, Jase S
1808417CEFOMCompleteYesNoWATER16-DEC-2025 00:0009-JAN-2026 00:00Harrison, William GerardWO - FWKD0115567 F&O Mechanics to drain down the 30C LCW bypass line when LCLS-SC beamline is off. Perez, Jase S
1808418CEFOMCompleteYesNoWATER18-DEC-2025 00:0009-JAN-2026 00:00Harrison, William GerardWO FWKD0108977 F&O Mechanics to drain down the existing MAG LCW line when LCLS-SC beamline is off. Perez, Jase S
18195811CBLDropYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelRack Relocation Sec 9 P14 Hernandez, Joel
1819588CBLDropYesNoOTHER13-JAN-2026 00:0030-JAN-2026 00:00Hernandez, JoelRack Relocation Sec 9 P4 Hernandez, Joel
1810611AMRFDropYesNoRF06-JAN-2026 00:0020-JAN-2026 00:00Wack, Bob JCM34-1 is PZt faulted after recovering machine from cryoplant trip. Replace the piezo PCB.Wack, Bob J
1804594OTHERRollNoNoOTHER22-JAN-2026 00:0030-JUN-2026 00:00Checchin, MattiaInstall SSA and waveguide frames anchors in S7 through S9. SOW steps - - drill and install anchors (contractChecchin, Mattia

LINAC MIDDLE GALLERY
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1842171OTHERActiveNoYesOTHER19-MAY-2026 00:0020-MAY-2026 00:00Needham, Richard ASaw cut and trench opening near Sector 11 for CRMF utilities. See RP memo RP-RPG-251112-MEM-01 -
1795961CEFOECompleteYesNoELECTRICITY07-OCT-2025 00:0009-OCT-2025 00:00Hart, Jeff JThe LOTO will affect LCLS II racks L2KG11-4C & 4D Inspect and repair damaged conduits in sector 11 See Ross Hart, Jeff J
1803122PEMCompleteYesNoKLYSTRON / MODULATOR24-JAN-2026 00:0028-FEB-2026 00:00Reagan, Jeff17-7 T/S and repair Circuit of DC HV meter and Circuit of DQ meter Chen, Xupeng
1811796CTLCompleteYesNoMOVERS07-JUL-2026 00:0010-JUL-2026 00:00Bong, JamesInstall motion control hardware in rack FKG10-11 for CEDOG collimator.Bong, James
1818663CBLCompleteYesNoOTHER09-JAN-2026 00:0029-MAY-2026 00:00Jenks, StephenSector 11 Penetrations 11-04 and 11-06 remove the Gas Cylinders, Regulator and any support related to it as weHugyik, John
1817671AMRFCompleteNoNoRF06-JAN-2026 00:0023-JAN-2026 00:00Delgadillo, Eduardo D.17-5 - SLED motor not at limit in the tune mode. Check the operation with the SLED test box. Kelly, Richard S
1818513MFDVCompleteYesNoVACUUM02-FEB-2026 00:00 - Guerra, Oscar14-8 WG valve limit switch replacement. Once completed coordinate with CTL (Alverson) to ensure limit switchesDiaz, Gregory L.

ACR
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1853931AMGActiveNoNoOTHER30-JUL-2026 00:0031-JUL-2026 00:00Hoover, Chris S.Preparation of the ACR for the B052 Switch to Generator Power for the Elevator Load Test - Documenting ObservaHoover, Chris S.
1822422SWEActiveYesNoPPS06-NOV-2026 00:00 - Brown, Garth W.Unlike other audible alarm channels (not warning channels) ch. 17 is fed by EPICS, not hard wired. The Linac WBrown, Garth W.

LINAC EAST GALLERY
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1837871AMRFCompleteYesNoRF15-JUL-2026 00:0031-DEC-2026 00:00Kelly, Richard SPCAV2 signal died over last year. CH2 of the PAD is not operational. Remove PAD and check internally for lKelly, Richard S

SOFTWARE
CATERJobShopStatusRCDRSWCFSubsystemJob Start TimeJob End TimeTask PersonJob DescriptionCATER Assigned to
1818181SWEActiveYesNoALARMS18-NOV-2026 00:00 - Summers, TashaUnbypass the things in the task list if they're ready. Summers, Tasha
1843417CTLActiveNoNoTEMPERATURE21-JUL-2026 00:00 - Curtis, CourtneyPYDM screens have been updated for HE, this required some changes to Temperature-git, AlarmHandler-temp, and TKarimian, Sherwin
1851922CTLActiveNoNoTEMPERATURE22-JUL-2026 00:00 - Curtis, CourtneyPYDM screens have been updated for HE, this required some changes to Temperature-git, AlarmHandler-temp, and TKarimian, Sherwin
1852741CTLActiveNoNoTEMPERATURE21-JUL-2026 00:00 - Curtis, CourtneyPYDM screens have been updated for HE, this required some changes to Temperature-git, AlarmHandler-temp, and TKarimian, Sherwin
1815619CTLActiveNoNoVACUUM10-AUG-2026 00:00 - Curtis, CourtneyPYDM screens have been updated for HE, this required some changes to AlarmHandler, VAC PYDM screens, and VacuuKarimian, Sherwin
1850894CTLActiveNoNoVACUUM10-AUG-2026 00:00 - Curtis, CourtneyPYDM screens have been updated for HE, this required some changes to AlarmHandler, VAC PYDM screens, and VacuuKarimian, Sherwin