Note: To re-test or edit data for an existing chassis, click on the "Edit" link next to the chassis number. To Test or create a new chassis, push the "Create" button.
| View | Edit | 001 | 50019123 | Sector 10 cage-Integra | - | - | 34 | damaged on 11/25/10. returned to vendor, return from Integra, needs retest. 6/12/2012. | | View | Edit | 002 | D5265-02 | RF Lab, As of 5/14/2012 | - | - | 34.31 | prototype,
As of 5/14/2012, chassis is at RF lab. | | View | Edit | 003 | 20019018 | 23-3, As of 5/14/2012 | 18-APR-2011 | 26.11 | 34.69 | waveform: desled
recovery time@ pin 4, <80nS | | View | Edit | 004 | 50019121 | 22-8 | 01-AUG-2011 | - | 34.1 | small ringing, Vp-p/total Vp=2.7mV/119mV=2.3%.
As of 5/14/2012:
Removed amp from chassis. Anatoly used for his experiment.
The chassis has a pre amp (ciao amp) Model # 23-2385, s/n 102. Received repair amp 6/29/2012. | | View | Edit | 005 | 50019672 | 23-1, As of 5/14/2012 | 01-AUG-2011 | - | 34.31 | small ringing, Vp-p/totalVp=3.2mV/122mV=2.6% | | View | Edit | 006 | 50019123 | 22-5, As of 5/14/2012, 27-2,spare shelf | 01-AUG-2011 | - | 34.86 | Small ringing Vp-p/total Vp=3.2mV/102mV=3.1%
| | View | Edit | 007 | 50019127 | 24-4, As of 5/14/2012 | 10-NOV-2010 | - | 34.45 | - | | View | Edit | 008 | 50019670 | B-15, cabnet. As of 5/14/2012 | 01-AUG-2011 | - | 35.2 | ready to install | | View | Edit | 009 | 50019017 | RF Lab | - | - | 35.12 | Damaged on 11/25/10. returned to vendor
As of 5/14/2012, chassis is at RF lab. | | View | Edit | 010 | 50019019 | Anatoly, B44. | - | - | 34.45 | 5/14/2012: B-15,cabinet.
3/18/2013: Anatoly using in RF lab for load testing. | | View | Edit | 011 | 50019188 | 23-4, As of 5/14/2012 | 18-APR-2011 | - | 34.63 | - | | View | Edit | 012 | 50019126 | 24-6, As of 5/14/2012 | 10-NOV-2010 | - | 35.46 | - | | View | Edit | 013 | 50019671 | 23-6, As of 5/14/2012 | 18-APR-2011 | - | 34.54 | waveform: desled
recovery time @ pin 4, < 80nS | | View | Edit | 014 | 50019120 | 23-8, As of 5/14/2012 | 18-APR-2011 | - | 35.48 | - | | View | Edit | 015 | 50019129 | 23-5, As of 5/14/2012 | 18-APR-2011 | - | 34.88 | waveform: desled
recovery time@ pin 3 = 80nS | | View | Edit | 016 | 50019020 | 23-7, As of 5/14/2012 | 18-APR-2011 | - | 34.44 | waveform: desled
recovery time: <80nS @ pin 4. | | View | Edit | 017 | 50019189 | 24-5, As of 5/14/2012 | - | - | 34.05 | No oscillation at all. | | View | Edit | 018 | 50019119 | As of 5/14/2012, B-15, cabnet. | - | - | 34.97 | Working point should be at 26.9dBm above at input when because the amplitude and phase are not as stable lower than this level when temperature is at 40deg. | | View | Edit | 019 | 50019019 | as of 2/26/2013, 27-2 rework shelf | - | - | 34.7 | Ring is after PSK. Frequency is 208MHz.07/26/11, open the Integra Module to fix the oscillation. Adding a 0.2pF cap can make the oscillation totally disappear before PSK. | | View | Edit | 020 | 50019187 | RF Lab, As of 5/14/2012 | - | - | 34.32 | fix osc by adding 0.3pF cap.
As of 5/14/2012, chassis is at RF lab. | | View | Edit | 021 | 50019118 | 22-2, As of 5/14/2012, 27-2, spare shelf. | - | - | 34.5 | Working point should be at 27.4dBm input when temperature is at 30deg because the amplitude is not as stable. But it is stable at 35deg from 27.06-27.4dBm. | | View | Edit | 022 | 50019125 | 22-7, As of 5/14/2012, 27-2, spare shelf | 01-AUG-2011 | - | 34.77 | Working point should be at 26.9dBm above at input. | | View | Edit | 023 | 50019128 | 23-2, As of 5/14/2012 | - | - | 35.06 | @ Pin = 25.12dBm, OSC after PSK. | | View | Edit | 025 | 50019190 | RF Lab. As of 5/14/2012 | 01-AUG-2011 | - | 34.66 | There is small oscillation after PSK. As of 5/14/2012, chassis is at RF lab. Removed chassis for rework, needs retest. 6/12/2012 | | View | Edit | 101 | D5265-01 | 24-5 | - | - | 28.13 | 1st amp, pre-production. | |
|
|